Laserfiche WebLink
#STATUS COMMENTS <br /> <br /> <br /> <br /> <br /> <br />7 Complete Secure water lines behind wash tub <br />8 Complete Finish running condensate line(AC/Furnace/ERV..) to drain <br />9 Re-inspection Required Steam shower doesn't meet size minimums for showers. Request an alternate <br />() <br />10 Complete Vent/Radon termination shall be 7 feet above roof <br />906.1 Use of Roof. Vent pipes shall be extended separately or combined and of full required <br />size, not less than 12 inches (305 mm) above the roof. Flagpoling of vents shall be <br />prohibited except where the roof is used for purposes other than weather protection. Vents <br />within 10 feet of a part of the roof that is used for such other purposes shall extend not less <br />than 7 feet above such roof and shall be securely stayed. <br />11 Re-inspection Required Secure roof vents in place as discussed