My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-28-2003 Council Packet
Orono
>
City Council
>
2003
>
04-28-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2023 4:12:48 PM
Creation date
1/26/2023 3:41:29 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
493
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
g) <br />i) <br />j) <br />Permits - Prior to the start of any construction, the Developer’s Contractor shall apply <br />for and receive all necessary permits from the City and/or government agencies <br />having jurisdiction. Required City permits relative to the Improvements include the <br />following; Site Grading Permit; Utility Construction Permit; Sewer and Water <br />Connection Permits. <br />Insurance - The Developer will cause each person who constructs and installs any <br />Improvement to maintain complete insurance coverage including Workmen's <br />Compensation, Liability and Property Damage. Developer shall furnish proof of <br />insurance covering any public Contractor’s equipment, laborers and hazard caused <br />by the Improvements. <br />It is additionally agreed that the developer shall submit a written schedule indicating <br />the progress schedule and order of completion of the work covered by this contract. <br />It is further agreed that upon receipt of written notice from the Developer of the <br />existence of causes over which the Developer has no control which will delay the <br />completion of the work, the City Council at its discretion may extend the date <br />hereinbefore specified for completion and that the Letter of Credit shall be extended <br />by the Developer to cover the work during this extension of time. <br />It is specifically understood and agreed that all work covered by contract shall be done <br />at no expense to the City of Orono except as may be provided in the Special <br />Conditions attached hereto and made apart hereof. <br />Copies of all bids, change orders, suppliers, subcontractors, etc. shall be forwarded <br />to the City Engineer for his files. <br />The Developer shall not do any work or furnish any materials not covered by the <br />plans and specifications and Special Conditions of this contract, for which <br />reimbursement is expected from the City, unless such work is first ordered in writing <br />by the City Engineer as provided in the specifications. Any such work or materials <br />which may be done or furnished by the contractor without such written order first <br />being given shall be at his own risk, cost and expense, and he hereby agrees that <br />without such written order he will make no claim for compensation for work or <br />materials so done or furnished. <br />Upon completion of all work required by the City Engineer or his designated <br />representative, a representative of the contractor, and a representative of the <br />Developer’s Engineer will make a final inspection of the work. Before final payment <br />Developer Initial_____ <br />« _ . City Clerk InitialPage 10 of 18 -------- <br />JL
The URL can be used to link to this page
Your browser does not support the video tag.