My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-28-2003 Council Packet
Orono
>
City Council
>
2003
>
04-28-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2023 4:12:48 PM
Creation date
1/26/2023 3:41:29 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
493
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Development Phasing <br />1. <br />2. <br />3. <br />4. <br />STONEB AY is intended to be developed in a number of sequential Phases over a period of <br />3-4 years. The various Phases have been designated as Phase One and Future Phases A <br />through D, per the Phasing Plan attached hereto as Exhibit J. The sequential order of <br />development of the various Future Phases has not been absolutely established, but relies to <br />some extent on market conditions and demand. Therefore, this Agreement will pertain <br />primarily to the Phase One improvements, and shall be amended as necessary prior to <br />commencement of improvements for each Future Phase. <br />The Phase One improvements include the construction of Kelley Parkway and associated <br />curb and gutter, sidewalks, lighting, signage and landscaping; construction of municipal <br />sewer and water mains and facilities within the right-of-way of Kelley Parkway; construction <br />of stormwater piping and facilities including the regional pond south of Kelley Parkway; and <br />construction of private roads and driveways as well as private and public sewer and water <br />lines and facilities within the area designated as Phase One as shown on Exhibit J; and <br />gfn^ral sitf gradinz far Phase 1 and future Phases . Phase One of the development includes <br />the construction of+9 25 two-stoiy townhome units and 22 2d rambler townhome units. <br />Commencement of Phase One improvements shall not occur until Developer has made <br />payment to the City of the prorated portion of the Development Fees (Park Dedication Fee, <br />Storm Water and Drainage Trunk Fee, and Sewer and Water Connection Charges) for Phase <br />One. Commencement of Future Phase improvements shall not occur until Developer has <br />made payment to the City of the prorated portion of the Development Fees associated with <br />said Future Phase. The Development Fees for each Phase shall be based on the proportional <br />acreage or number of units within each Phase depending on the method of calculation of <br />each fee, relative to the total project. The schedule of Development Fees is attached hereto <br />as Exhibit K. <br />Nothing in this Agreement is intended to prohibit the commencement of Future Phases prior <br />to completion of earlier Phases, nor to establish a specific sequence for the various Phases; <br />except that. c^ompletion of Phase 1 improvements shall be required before commencement <br />of any Future Phase.._c.vcgpr that Phase 2 grading a nd utilities may he commenced prior to <br />completion of Phase 1 improvements. <br />Page 6 of 18 <br />Developer Initial, <br />City Clerk Initial <br />i i <br />IJ-------
The URL can be used to link to this page
Your browser does not support the video tag.