My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-24-2003 Council Packet
Orono
>
City Council
>
2003
>
02-24-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 2:35:17 PM
Creation date
1/26/2023 2:25:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
laserfiche2
Created:
1/26/2023 2:35 PM
Modified:
1/26/2023 2:35 PM
Text:
http://www.oim.dot.state.mn.us/access/index.htmn
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Est. average daily traffic <br />Est. peak hour traffic <br />9. Will these changes require improvements to the existing local and regional road network or <br />interchanges, beyond what is in the community's current transportation plan? <br />Not appli cable, no changes in trip generation <br />No <br />Yes, describe Improvements and who will pay for them: <br />Access <br />10. If the site has direct access to a principal or “A* minor arterial, is location and spacing <br />consistent with applicable County guidelines or MnDOT's Access Management Guidelines <br />(http://www.oim.dot.state.mn.us/access/index.htmn ? <br />Not applicable, no direct access to a principal or "A* minor arterial. <br />No, explain: <br />Yes, describe: <br />Transit and Other Modes of Transportation <br />11. Will this amerKicnent enhance access to transit services, increase or decrease the demand <br />for transit services or warrant the extension of new transit service? <br />Not applicable, currently not served by transit nor warrant extension of services. <br />No, will not affect transit. <br />Yes, list existing routes, describe changes and identify proposed/necessary transit facility <br />improvements (e.g. shelters, park and rides): <br />12. Does the plan amendment Include Traffic Demand Management (TDM) strategies or land <br />use and urban design measures, if applicable? <br />Not applicable <br />No, explain <br />Yes, describe (e.g. car and van pooling, flexible work hours, mixed land uses that <br />discourage vehicle trips and promote walking, biking, ridesharing, and transit): <br />13. Does the plan amendment include pedestrian and bike access and facilities, including <br />crosswalks, bridges, trails, sidewalks, and bike racks, if applicable? <br />Not applicable <br />No, why not: <br />Yes. describe: <br />Wastewater Treatment <br />14. What type of wastewater treatment will be utilized to serve the proposed development? <br />Individual Sewage Treatment Systems (ISTS). Skip to 18. <br />Privately Owned/Community Treatment System. Skip to 18, <br />Municipal Treatment. Answer questions 14 arut then Skip to 18. <br />November 19. 2002
The URL can be used to link to this page
Your browser does not support the video tag.