Laserfiche WebLink
CITY OF ORONO <br />Old Long Lake Road Sanitary Sowar Extension <br />Preliminary Cost Estimate <br />BRA File No. 139-03-127 <br />Preliminary Cost Estimate <br />ITEM UNIT <br />EST. <br />QUANTITY <br />UNIT <br />PRICE <br />EST. <br />COST <br />r HOPE SDR 11. directional bore <br />Sanitary service, incl. curb stop <br />Flushing station connection <br />Connect to existing manhole <br />Seeding incl. topsoil, mulch, fert. <br />Estimated Construction Cost <br />*5% Contingencies <br />LF <br />EA <br />EA <br />EA <br />AC <br />2000 <br />4 <br />1 <br />1 <br />0.5 <br />$14.00 <br />1,500.00 <br />3.000. 00 <br />1.000. 00 <br />3,000.00 <br />PraNminsiy Cost Estimatf (1-16-(^)j^ <br />$28,000 <br />6,000 <br />3.000 <br />1.000 <br />1,500 <br />$39,500 <br />1,975