My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-2003 Council Packet
Orono
>
City Council
>
2003
>
02-10-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 2:08:30 PM
Creation date
1/26/2023 1:58:33 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, January 27,2003 <br />7:00 o^clock p.m. <br />NORTH LONG LAKE EAST SEWER - Continued <br />Gappa stated that the 2000 MUSA expansion area, south of County Road 6, could logically <br />be divided into two separate areas for possible sewer projects labeled A and B. Mr. <br />Crotteau’s property is the second easternmost property in area A, and there does not appear <br />to be strong interest in a sewer project from the other three residents in the middle of area <br />A. Gappa pointed out that a preliminary cost estimate for the installation of a pressure <br />sewer system across area A would run approximately SI6,000 per unit. Because area B <br />would be a separate project area, and none of the residents have expressed any interest in <br />obtaining sewer, Gappas indicated that staffs recommendation would be they not be <br />considered for sewer at this time. <br />Gappa stated that consideration for sewering the entire area A was used to determine an <br />appropriate connection fee for Mr Crotteau, as well as, the City completing a project to <br />extend the sewer across his property with a service stub for the property. The property <br />owner would pay the project connection fee of SI 6,000 plus provide casements, at no cost, <br />for extension of the sewer across his property. The property owner w ould also be <br />responsible for hiring his own licensed plumber to install a grinder pump station and <br />connect to the service stub. Completing Phase I of the Area A sewer project would <br />provide sewer service for Mr. Crotteau this spring. <br />White inquired if the neighbor, the Dayton’s, had expressed any interest in the sewer <br />project. <br />Mr. Crotteau indicated that he had spoken to his elderly neighbor and that there may be <br />some interest, however, he will let them set it up with the City themselves if they choose to <br />pursue it. <br />White clarified that the previous $23,000 was costly, whereas, the current Phase I plan <br />more realistic at $16,000. <br />Sansevere moved, Murphy seconded, to approve the staff recommendation regarding <br />the allocation of costs to the Crotteau property, located at 1405 Sixth Avenue North, <br />for the extension of sewer service. N'OTE: Ayes 5, Nays 0. <br />PAGE 25 of 28
The URL can be used to link to this page
Your browser does not support the video tag.