My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-2003 Council Packet
Orono
>
City Council
>
2003
>
01-27-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 1:59:13 PM
Creation date
1/26/2023 1:41:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. <br />3. <br />Other hardcover removals include reducing the size of the lakeside deck removal of a shed <br />located near the street, an open porch on the streetside of the house would be removedfor <br />the garage addition, and a sidewalk and wood planter box would be removedfrom the west <br />side of the property. <br />Section 10.24, Subdivision 5 (B). To permit a 9.7 side setback for the residential addition <br />located at the northeast comer of the new house. <br />'ighth , 9 • • • r <br />caused the corner of the house to encroach into the required setback. It was not until after <br />the house was designed and drawn on the survey that the encroachment was discovered. <br />Section 10.03, Subdivision 14 (C). The proposed lot coverage by structure is 2,612 s.f <br />(15.6%). The Zoning Code permits up to 15% of the lot area to be used for structure on the <br />property. The total lot area is 16,750 s.f, which allows a total of 2,513 s.f (15%) of lot <br />coverage by structure on the property. <br />Lot coverage by structure ordinances were adopted to preserve space between buildings and <br />regulate the massing of structures. Additional structure also contributes towards additional <br />hardcover which can negatively impact water quality by not allowing storm water to run <br />across natural ground surface The concept is to allow storm water to be slowed and to <br />infiltrate into the ground. <br />Staff had requested Gronberg and Associates, surveyor/engineer, to re verify their final <br />calculations to determine the actual size of the proposed house. The total structure <br />confirmed to be 2,612 s.f. which is 99 s.f. more structure than the property is allowed. <br />Statement of Hardship <br />Applicant has included a hardship statement that is included as part of Exhibit A. To summarize the <br />hardship the property owners state they are expanding the house to be comparable to other houses <br />in the neighborhood, and they are adding to the existing house closer to lake rather than towards the <br />street to protect an 80 year old oak tree. <br />Site Drainage <br />Staff received the final site grading and drainage plans on February 14'" and have not had an <br />opportunity to complete review as of the date of this memo. Any recommendation of approval shall <br />require additional City Staff review of the plans prior to any Council action. <br />«02-2751 Wcsky Byroe <br />2117 Casco Point <br />Fcbnivy 19.2002 <br />Pife2or4
The URL can be used to link to this page
Your browser does not support the video tag.