Laserfiche WebLink
S <br />CITY OF ORONO <br />North Long Lake Sewer Extension <br />Preliminary Cost Estimate <br />BRA File No. 139-03-125 <br />Preliminary Cost Estimate <br />ITEM UNIT <br />EST. <br />QUANTITY <br />UNIT <br />PRICE <br />2* HOPE SDR 11, directional bore <br />Sanitary service, incl. curb stop <br />Flushing station connection <br />Air release manhole <br />Connect to existing manhole <br />Seeding incl. topsoil, mulch, fert. <br />Estimated Construction Cost <br />•fS% Contingencies <br />LF <br />EA <br />EA <br />EA <br />EA <br />AC <br />1800 <br />5 <br />2 <br />1 <br />1 <br />1 <br />+20% Legal, Engineering and Administration <br />•!-5% Capitalized Interest and Bonding <br />Total Eattmated Coat <br />Preltminary Cost EstinMOe (1-23-03).xi8 <br />$17.00 <br />2.500.00 <br />2.500.00 <br />8,000.00 <br />1,000.00 <br />3,000.00 <br />EST. <br />COST <br />•II • <br />$30,600 <br />12,500 <br />5.1 <br />8.1 <br />1,000 <br />3,1 <br />• • • <br />• II <br />$60,100 <br />3^005 <br />$63,105 <br />12,621 <br />$75,726 <br />3,786 <br />$79,512 <br />jd