My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-2003 Council Packet
Orono
>
City Council
>
2003
>
01-13-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 1:47:48 PM
Creation date
1/26/2023 1:38:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f CHANGE <br />ORDER <br />OWNER <br />ARCHITECT <br />CONTRACTOR <br />FIELD <br />OTHER <br />AIA DOCUMENT G701 <br />THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES. CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS <br />COMPLETION OR MODIFICATION. AUTHENTICATION OT THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA <br />DOCUMENT D401 <br />PROJECT: <br />(Name, address) <br />Long Lake Fire Station <br />340 Willow Drive <br />Long Lake, MN <br />CHANGE ORDER NO.:FOUR (4) <br />DATE;November 26, 2002 <br />TO CONTRACTOR:Rochon Corporation <br />Suite 120 <br />3650 Annapolis Lane North <br />Plymouth, MN 55447 <br />ARCHITECT’S PROJECT #: 1515.01 <br />CONTRACT DATE: <br />CONTRACT FOR:Complete Construction <br />The contract is changed as follows: <br />1. Misc cost Item It 23 Cost to import and compact till from the property line west to tho <br />center of willow street curing the utility inslj<ij;>un on tlie project Tins cost is the <br />responsibility of Orono, Minnesota, since it is outside the construction limits and was <br />required to reconstruct the road as a part of the "extra' utility installation. <br />(Unforeseen site condition) <br />S 16.210 00 <br />Total of item # 1. including Contractor's overhead & profit S 16,210 00 <br />The original Contract Sum was <br />Net change by previously authorized Change Orders <br />The Contract Sum prior to this Change Order was <br />The Contract Sum will be increased by this change order in the amount of <br />The new Contract Sum including this Change Order will be <br />$ 1,981,000 00 <br />S 121,777.36 <br />S 2.102,777 30 <br />$ 16,210 00 <br />S 2,118,987 36 <br />S <br />The Contract time will be increased by 0 days. <br />The date of Substantial Completion as of the date of this Change Order is therefore January <br />7, 2003 <br />NOTE This summary loos not reflect changes in tho Contract Sum, Contract Time or Guaranteed Maximum Price wfrich <br />have been aultiorced by Construction Change Directive.________________________ ____________ <br />f <br />Authorized <br />ARCHITECT CONTRACTOR OWNER <br />Boarman Kroos Vogel Group, Inc. <br />Address <br />222 N 2i <br />Minneapolis, 1 <br />? N 2^ <br />Roction Corp <br />Suite 120. 3650 Annapolis Lane North <br />Plymouth. MN 55447 <br />City of Long Lake <br />1964 Park Ave. <br />Long Lake. MN 55355 <br />DATE <br />OWNER <br />DATE <br />//7A' <br />DATE <br />City of Orono <br />P O Box 66 <br />Crystal Bay. MN 55323 <br />BY <br />15aTE <br />AIA DOCUMENT G701 ‘ CHANGE ORDER * 1987 EDI DON * AIA • COPYRIGHT 1987 • <br />THE AMERICAN INSTITUTE OF ARCHITECT S 1735 NEW YORK AVE.. N.W . WASHINGTON. 0 C 70006 529Z <br />WARNING. Uniicens«<j plKMocopying vK)l,iles U S copynghi i.w and i$ subfect lo legal prosecution. This docuiricnt vva$ eieclroolca'’/ prockiced with pemiisson <br />ol the AIA and cannol be reproduced without woljtion until the d Jte ol eipiral on noted below. ___ <br />Q'i'ROM5l5 0l IIUSCO-4 nix'
The URL can be used to link to this page
Your browser does not support the video tag.