Laserfiche WebLink
Long Ldke Fire Station • Schedule of Miscellaneous Costs <br />1 INclfii C.O. <br />aiiiMnl lltfii Oeigriptlofi Type OuMe Statui <br />J1a<Pandfng Amount Rofoctad Ameufit 6 Ratnarba <br />1 1 Additional tilt fence Civil 574.00 Approved 07/02/2002 574.00 2 Addtd sill fence per Watershed (Miller) <br />2 2 Gravel at water main biitallation CivU 2.269.00 Approved 06/19/2002 2.285.00 t <br />2 Import grevet 6 feoteMIle fabric <br />3 3 fttujpoly framet 1IBA. 1180.1240 Arch 735.00 Approved 07/31/2002 735.00 mcratse threat dim. to at w/ precast <br />4 6 Incrtata In (larapet heigM lor root luaranleo Arch • 690.00 Amoved 06/06/2002 650 00 2 Increase parepel for reel werrenty <br />9 4 Add metal stud wall at mezzanine to miss angle Arch 266.00 Approved 08/14/2002 26563 2 Improvt electrical stability of pantlt <br />6 This Hno not used <br />7 7 Add openif^ 224A (o door sdwdule Arch 782.00 Pending 78200 Shown on ilt d«w. MHied on sched.a a Coofdlr>ate door • 3* on sched.. 3 6* on plan Arch 111.00 Pending 111.00*Oifftrtnet of dr. schtdult 6 plan view <br />EMhar mite, cast #9 or alO is desired. Seea9 Add four-men fiN meter for Trvcii water hN Mech 3.237.44 In PA a 11 000 3.237.44 X PRall <br />•Cither miK. cast #9 or a 10 is desired. See <br />10 Add fie Inch Ml meter for trueb water-Ml Mach 5.764 00 InPAPll 000 5.764.00X PRpll <br />II Change metal letters from Alum. To Brenze Arch 1.14900 Aeiected 0.00 1.145.00X Changed during Shop drawmgsl <br />12 Stoned hood to metal locSers Arch 1.23300 Pemfirig 1.233 00 2 Import sMt at raducad UiVt cost <br />13 Add fdl to parbif^ lot Cmi 70.000 00 Aeieclcd 70.000 00 X earthwork summary daletad on Add 1 <br />14 Added cost for eicavator • Wet summer Civil 15.401.00 Aejected 15.401 00 X No documentalron <br />IS IS Cut bottom of roof screen cofumns (ASI e6?)Arch 41400 Ptntfng 41400 3 <br />16 16 Change to hose reel mounts at apparatus b^Arch 57.00 Pendmg 57.00 3 <br />17 17 Cut angle at root screen Arch 414.00 Pending 41400 3la16 tnitalt 16 rooftop frames at roof drains Mech 1.696.00 Pending 1.698 00 <br />19 24 Citend manhole 137 two feet &vU 1.025.00 Reiecled 000 1.025 00 ■• <br />20 20 Add 2 line rail at mezz an handling unit Arch 1.328 00 Rejected 1,326001 It this really needed. <br />21 Ad|ust Ffta2 total on Change order No. 2 Owner 268.00 Approved 10/09/2002 266 00 3 Accounting orror on CO i2. <br />22 19 AddMIonal cost to widen gale at mezzamne Arch 2.096.00 Retected 2.096.001 To rnokt goto wider. <br />23 21 Soil replacemeni at WiMow Street utihiief Civd 16.210.00Approved 16.21000 4 Import sin it reduced Unit cost2422 Gyp. bd. above coding m plenum space Arch 1.612.90 Approved 11/23 2002 3.61250 3 <br />25 23 Deduct for Walts 002 model 957 OSY Mech 500.00 Approved 11/05/2002 500 00 3 SetPRiUJ <br />•26 26 Water pump for do watering Arch 2.056.00 Pending 2.056.00 <br />12727 Overhead door buttons m three locations elect 3.166 00 Refected \186002020 Overhead door buttons m two iocaito«*s elect 2.656 00 2.656.00■ <br />29 Parking lol sod rmnsions f».a 62.460.00 Pending 62.460.00. <br />30 instab 2 bne rail around Mezz. Air haiMfmg unit Arch 1.250.00 Refected 1.29000■ Nolremilredbycode <br />31 B*tuminous wear oeurse at Cast parturtn Dvd 2.964.00 rvnoH^2.964.00 <br />32 30 Oetamtng web revtslens ttvd 2.712 00 Raiected iJilM a *Soo ItHer IP 8. Havos* 11/12/0233 <br />34 <br />35 <br />36 <br />31 Oetaming woN revtslens CivM 1.167.00 <br />• <br />Ptndbig 1.167.00 <br />o o • <br />37 <br />30 <br />39 <br />40 <br />• • • • • .Si <br />• V <br />• • • •• . • .• w . <br />a <br />« <br />O <br />a <br />e <br />0 0 • . . . . ♦ * <br />I ITOTALl 1 1[ 1 2d>,901 1 1 1 5 29.165.1J 1 5 72.491.00 I i 109.824.44 \-ol <br />Mk. Con Ittmi firapeivd by Q/KPMI <br />OMtbirlnM n/21/2002 <br />---- <br />lAAk. n ■ r ■