Laserfiche WebLink
r <br />h <br />-t <br />2003 <br />RATE SCHEDULE <br />(Private Developer) <br />Clasilflcatioa <br />Senior Principal <br />Principal <br />Project Manager | Planner <br />Registered Engineer/Architect/Landscape Architect <br />Senior GIS E>esigner | Water Resource Specialist <br />Project Engineer/Architect/Scicntist/Landscape Architect <br />GIS Designer | Senior Designer <br />Graduate Engineer/Architcct/Scientist/Landscape Architect <br />Senior DraRsperson <br />DraRsperson <br />Project Technician <br />Senior Field Supervisor <br />Field Supervisor | Senior Crew Chief <br />Senior Inspector <br />Inspector | Crew Chief | Senior Technician <br />Technician <br />GPS Survey Equipment <br />Total Station Equipment <br />(ilS Worlstation Equipment <br />GPS Suhmeter Unit (per half day) <br />2003 <br />$ 138.00 <br />$ 131.00 <br />$ I25.0P <br />$ 112.00 <br />$ 112.00 <br />$ 99.00 <br />$ 97.00 <br />5 91.00 <br />$ 79.00 <br />$ 71.00 <br />$ 49.00 <br />$ 105.00 <br />$ 92.00 <br />$ 79.00 <br />$ 73.00 <br />$ 51.00 <br />$ 30.00 <br />S 25.00 <br />$ 20.00 <br />S 50.00 <br />Direct Project Expenses - At Cost: Reproduction, printing, duplicating, mileage and any outof pocket <br />expenses sucli as stakes, field supplies, telephone calls, etc. <br />lliese rates are adjusted annually in accordance witli the normal review procedures of BonesOtJo. Rosene. <br />Anderlik and Associates. Inc. <br />City ofOrono <br />1 <br />Ii