My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-18-2004 Planning Packet
Orono
>
Planning Commission
>
2004
>
10-18-2004 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 1:22:53 PM
Creation date
1/26/2023 1:18:03 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
laserfiche2
Created:
1/26/2023 1:22 PM
Modified:
1/26/2023 1:22 PM
Text:
http://www.piUarbomes.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L. <br />EXHIBIT B <br />riLLAR HOMES PARTNER <br />Date: July 21.2004 <br />Re: 1625 Bohns Point Rd. <br />Conditional Use Permit Application <br />This is a very large home site, with lakeshore to the west, frontage on Bohns Point Rd. <br />and a street side pond to the east Upon receiving a building permit on 10/13/03, Pillar <br />Homes started construction of a new home on this site. The home w*as placed and built <br />exactly in accordance with the home plans for the lot submined for permit. This home is <br />nestled next to a small knoll or hill on the north lot line, with additional dirt raised around <br />the home. Most of the dirt was hauled in and placed on the east (non-lake) side of the <br />home in the fall of 2003, and has been allowed to settle over the winter. Months later, <br />after a very thorough, professional landscape plan was created which included final grade <br />and planting schedule, retaining walls etc, we submitted the landscape plan to the Orono <br />staff, not knowing that wc needed a review for grading and/or dirt brought in in excess of <br />500 cubic yards. This CUP grading request is now before you already vigorously <br />reviewed by Staff and all changes requested to the original grading plan have been <br />implemented on site and approved by Staff and City Engineers as instructed. <br />Since the original grading plan required a large amount of dirt to be brought to the site, <br />and the house plan was approved, we simply backfilled the foundation that was approved <br />to be installed. We had no plan to deviate from our original survey. However, our <br />foundation wall height that was on the approved surv ey was misinterpreted slightly on <br />the original elevations on the permit survey. This unknown difference was discovered on <br />the landscaping plan, and all changes that staff required to prevent improper water flow <br />were implemented. Drainage swailes and retaining wall, draintile and other requests <br />were fair and implemented on site, to assure all code and regulations were met <br />We therefore request a conditional use permit for grading of dirt brought to the property <br />in an amount in excess of 500 yards. <br />Thank you for your consideration. <br />Carol & Roger Rovick <br />1625 Bohns Point RxL <br />KC Chermak <br />Pillar Homes <br />PILLAR HOMES PARTNER, 125 Lake Street West, Wayzata, MN 5391 <br />Phone: 952.473.2351 Fax: 952.473.8317 www.piUarbomes.com
The URL can be used to link to this page
Your browser does not support the video tag.