Laserfiche WebLink
l/]jBonestroo <br />^^.Rosene <br />Andertik & <br />I Associates <br />Engineers 4 Architect! <br />2335 WtiX Highway 36 • St Pau». Wf^l S5tl3 <br />Office 65I-636-4600 • Pas 65'-636-»3:i <br />wwwhonettroo con <br />October 5.2004 <br />Mr. Mike GtfEron <br />Pluming Director <br />City of Orono <br />Post Oflice Box 66 <br />Crystal Bay, MN SS323 <br />ocf 7 aw <br />Stonebay Lofts <br />Flic No. 139-04-000 <br />rist No. 04.3062 <br />Dear Mike; <br />We have reviewed the preliminary grading, drainage and erosion control plans for the proposed Stonebay <br />Lofts. The site is locued along the westerly side of the Stonebay subdivision north of Kelley P.irkw ay and <br />adjacent to the City’s Public Works Building. We have the following comments with regards to engineering <br />matters: <br />If you have any questions please call me at (651) 604-J863. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES. INC. <br />TomKenogg <br />Cc: Greg Oappa. City of Orono <br />• St Paul. St Cloud. Rocheiter Wii'maf. MN • Miiw/»ukee. '.vl • Chicago. IL <br />c <br />• Sheet C3.2 shows proposed reuining wall coiutniction along the north end of the proposed building. <br />Some of the walls shown exceed 6-fcct m height. All retaining walls that exceed 4-feet in height require <br />a separate engineered design and deUtl submittal for review and approval. <br />• Stop signs should be added for outbound traffic from the undaground parking accesses. <br />• The plans should include a pedcsuian crossing sign at the crossing shown near the middle of the outdoor <br />parking area. <br />• The applicant should provide the City with the project SWPPP for the Phase II Construction Site Permit <br />and a copy of the Notice of Coverage Certificate pnor to startmg work on site. <br />• The grading plan should include erosion and sediment control details and notes. Items such as fiber <br />blanket installation and location, inlet protection, stockpile locations, silt fence maintenance <br />requirements, constniction entrances, and any other issues relating to erosion and sediment control <br />should be clearly shown on the final plans. <br />• I he linai plans snouid loentify ttie name ana pnonc numorr tor engincenng contact pci son regaroing <br />erosion and sediment control issues.