Laserfiche WebLink
H04-3027 <br />June 21. 2004 <br />Page 2 of 7 <br />Background <br />The City currcnlly is under a moratorium for any development of 2 units per acre or <br />more. This project is being allowed to undergo the sketch plan process only. No formal <br />application will be accepted until the moratorium has lifted. The Council has indicated <br />that allowing this sketch plan to proceed through the process may help the City better <br />understand what changes need to be made to the Zoning Ordinance to be prepared for this <br />type of development. <br />SKETCH PLAN REVIEW <br />Conformity’ with 2000-2020 Orono Community Management Plan <br />The property is guided for a mi.xture of urban single and multi-family residential uses at a <br />density of 2-4 units per acre. This plan proposes the maximum 4.0 units per acre. The <br />property is located within the MUSA and is intended to be served with public sanitary <br />sewer and water. The CMP notes that the “Preferred Development Option” would be a <br />mix of '/} unit per acre single family residential including 4 unit per acre towiihouse <br />development. 'Hie applicant's plan proposes all single family lots ranging from S.8S5 to <br />14,922 square feet in size, where the average lot size is approximately 8,500 square feet <br />or less than 1/5 of an acre. The plan as proposed does not meet the preferred <br />development option noted in the CMP. It should be noted that the recommendation in the <br />CMP regarding development of this site assumed concurrent development with the <br />Dumas Apple Orchard property to the west. <br />Relationship to Surrounding Development <br />This property abuts Highway 12 to the north and Old Cr>stal Bay Road to the cast. An <br />existing single family residence is located to the northeast comer of the proposed plat <br />boundary’. Right-of-w’ay owned by the Minnesota Department of Transportation exists to <br />the direct south which consists of the Highway 12 B>'pass cunently under construction. <br />Abuning the subject property to the west is the Dumas Apple Orchard property <br />comprising over 50 acres with ap|voximately 1.'3 of it consisting of wetland. This <br />property is also guided for a mixture of urban single and multi-family residential uses at a <br />density of 2-4 units per acre <br />Conformity with Zoning District Lot Requirements <br />The property is in the RR - IB. One Family Rural Residential District, which allows for <br />single family residential uses with a minimum lot size of two dry buildablc acres. The <br />applicant has proposed a plan following CMP recommendations at 4 units per acre, which <br />would require that the property be rezoned. It is preferred that the property develop <br />under a Planned Unit Development (PUD). <br />Lot Lay out and Lot Standards <br />Currently, there arc two base lots, both in common ownership, which would be expected <br />to be combined with the plat. The individ»ial lot lay out is shown in Exhibit D. The <br />applicant has proposed 5 different building types illustrating how the lots would be <br />developed. The building footprints range in size from 1,744 square feet to 1,964 square