Laserfiche WebLink
1i 25C4 <br />P»8t33<5 <br />amounts of hardcover for the 90 s.f. of hardcover they were proposing to add to the 0*75’ <br />setback zone. Tnesc removals u-ere completed and the hardcover remains as it was <br />approved in 1992. ('see Hardcover Variance section for more details.) <br />Most recently the current owner began a project to repair roned decking in order o assure <br />the safely of the structure As the repairs progressed it was apparent that the “repair ” of <br />the existing deck was resulting in a total replacement. It was at that lime that the <br />contractor A'as notified by Bruce Vang. Orono Building Inspector, a permit would be <br />required. After researching the file it was determined that, as the deck was non- <br />conforming in location and hardcover, variances would also be required. <br />LOT ANALYSIS WORSHEET <br />Lot AreaAVidth; <br />LR-IB 1 Lot Area 1 Lot Width 1 <br />Required 1 43.560 $f (1 acre)i 140- ! <br />Actual 155.7-1 $f (3 6 acre)390 * <br />Setbacks; <br />LR-IB Required Etitling Proposed <br />Lakeshore i> 75'49' (house)59 (deck) 1 <br />Rear ! -'O' 1 <br />Nonh Side 30- I 1 <br />South Side 30- 1 1 <br />Average Lakeshore No neighboring homes ’ <br />Structural Coverage; <br />Total Lot Area 1 Total Structural Coverage <br />3 6acre(155.77| $.f)I N.A - The propcrr> exceeds 2 acres ’ <br />Hardcover Calculations: <br />Hardcover <br />Zone <br />Total Area in <br />Zone <br />Allowed <br />Hardcover <br />Existing <br />Hardcover <br />1992 <br />Varunce <br />Approval <br />Proposed <br />Hardcover <br />C-75 3l,l29 8 if Osf <br />(O*-.) <br />3.464 3 1 f • <br />(IM%)11 4.121 8sf <br />(I3 2?S) <br />75-250 71.277 If.17.806 I f <br />(25V.) <br />11.658 Osf <br />(16 4 V.)NA i No Change <br />250-500 53.356 6 I f 16.009 s.f <br />(30V.) <br />14.646 sf <br />(27 4 S)NA No Change <br />* After exclusion of fabric or plastic-lined landscape beds