Laserfiche WebLink
•04-2974 SiMtkty Martdptoc* <br />May 13.2M4 <br />Page 7 <br />Liehtln^. The exterior parking lot lighting plan is in Sheet E2.1. The plan indicates 20 “Gardco” <br />400W luminaires at strategic locations throughout the site, on 20' high poles. The light poles <br />at 20' will be lower than the peak heights of the buildings. Details on the Gardco fixtures <br />have been provided for review. Applicant should address u'hether any building-mounted <br />lighting Is proposed. <br />Engineering Matte rs. City Engineer Tom Kellogg provided his comments in Exhibit G dated <br />April 28. He has also reviev^’cd the May 7 plan set and his comments remain unchanged. His <br />recommendations relate primarily to matters that will be addressed during the final plan stages of <br />development. <br />4. PrellmlBarv Flat <br />Plat approval will include the establishment of drainage and utility easements, as wrM as payment <br />of park fees and stormwater & drainage trunk fees (both established as pan oi me previous <br />Stonebay PUD approvals), etc. Preliminary plat approval will be concurrent with site plan <br />approval. The two-lot layout and separate ownerships do not pose any formidable considerations. <br />Shared parking, site maintenance responsibility and similar agreements will be established as a <br />matter of course. <br />Reaoniny <br />As noted previously the rezoning goes hand in hand with the Comp Plan Amendment, and will <br />provide for a greater level of detail than the Plan. Planning Commission identi fied a specific list of <br />allowable or unacceptable uses for the site in February, and refined that list in March. The list of <br />uses will be incorporated into the PUD rezoning for this site, as will a fairly detailed set of conditions <br />related to the specific site plan approval for Outlot A. Staffintends to incoiporaie into the rezoning <br />ordinance condiuons of approval that clearly document the approved site layout, building design <br />and materials, signage lighting, etc. The PUD approval for this site becomes the governing <br />ordinance for the properly. A drafi rezoning ordinance for the site has yet to be prepared by staff, <br />but will be prepared for your review prior to final Council action.