Laserfiche WebLink
r- <br />k <br />R9Stor»Uon 0bj9etiv99 and Construction Prepos9d <br />• Provide water quality treatrrtent for Stubbs Boy <br />• Erjhonce wikfife and aesthetic functiorkol values <br />• Restore the wetlarxj plant corrmunity within the reed ccnoy gross <br />px)ftlon of weilarxl <br />• Restore hydrology to the wetland bosn with a senes of a<tcn pioc;<s <br />and 0 berm with c control structure. <br />Stops In ths propossd wottsnd restorstlon Include the following: <br />1. Construct o berm and outlet control structure. <br />2. Complete two controlled bums of the wetland ste to aid in <br />controllino the reed carory gross orxi increose the nutrient uptake <br />of the wetland wttn new growth of vegetotton. Provide a spot <br />treotment of herbicide to further control reed canary grass. <br />3. Seed selected portions of the wefond with wetland grass orxj <br />forbs. <br />Table 5.7 Project Cost for Wetland SB-E-31 <br />Compononts j Description Approximate <br />Cost <br />Suiveys Field and topographic survey of site $ 3,000 <br />Design Complete site design mdudlng draft plan and Final <br />construction documents $ 9,000 <br />Permits ! Obtain necessary permits $ 2,500 <br />Meetings Meetings »vlth Oty staff and surrounding landowners ji S 1.300 i <br />Land and Legal <br />^ Purchase of easements around wetland or access to <br />; control structure. Easements should already exist <br />along pubitc road for access to control struaure. <br />$ 1,500 <br />Restoration <br />Complete 2 prescribed bums and spot herb ede <br />treatment to control eteUcs $ 5,000 <br />Seed and/or plant fringe areas $ 7,500 <br />Construction berm, ditch blocta and control structure $35,000 <br />Approximate Project Cost $64,800 <br />atycrome