My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-19-2004 Planning Packet
Orono
>
Planning Commission
>
2004
>
04-19-2004 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 11:42:11 AM
Creation date
1/26/2023 11:34:17 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RBStOfMtton Obj9ctlve8 and Construction Proposed <br />This site is high profile due to its location cd^ccent to the Luce Line Trail <br />and within lend publicly owned by the City. The goals for we*lond <br />restoration will include the following; <br />• Control runoff rotes to Pointer Oeek <br />• Restore native diversity of wetland vegetation, including wet rreoaow <br />and emergent norsh plont comnnuniries <br />• Enhonce the wildlife and aesthetic viewing of the wericnd for tne <br />public using the Luce Ur>e Trci! <br />• Er^honce the Pointer Creek wildlife corridor <br />Steps In the proposed wst/and restoration include the following: <br />1. Complete two controlled dims of the wetland Site to c’d m <br />controlling the reed conory gross ond cattail Provide a soct <br />treatment of herbicide to further control reed cor cry gross. <br />2* ^nt^verse mix of wet meadow grasses erxj forps In the wet <br />3. Construct a control structure at the outlet of the wetland <br />Table 5.5 Project Cost For PC-M-31 <br />Tasks Description Approximate <br />Cost i <br />Surveys i Fieid and topographic survey of s.te 1 * 2,coo” <br />Design ♦ Complete site design ircudl-vj draft plan and final <br />* construction documents * 4.0CO <br />Meetinos Meetings with Qty staff and surrounding i <br />landowners ;1 s :.30o <br />. Permits exxain necessary permits S 2.000 <br />i <br />I Restoration <br />i <br />: Complete 2 presented bums and spot hertiode <br />! treatment to control exoOcs S 3,000 <br />! Seed with wet meadow mbc $ 7.500 <br />1 : construction of control structure $ 15.000 <br />1 Approximate Project Cost $34,800 <br />5.S.3 Wetland LL-C-26 <br />Approximate ate Sze: 14.5 acres <br />Township __118N Range 23 w Section 26 <br />Watershed Nan>e; Mississippi River (Metro) Watershed #: 20 <br />City Wotershed Name: Long Lake (DNR 834W) <br />OtyefOrono
The URL can be used to link to this page
Your browser does not support the video tag.