My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-15-2004 Planning Packet
Orono
>
Planning Commission
>
2004
>
03-15-2004 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 11:30:22 AM
Creation date
1/26/2023 11:22:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
John Trautz <br />March 1,2004 <br />Pages <br />7t BuildinyDcaipi and Materials. We have been pleased with your efforts toward providing <br />ahigh quality building design theme for the site. However, the light color of the brick you <br />have chosen is not acceptable and needs to be substantially darker. We would suggest a <br />red brick similar to that being used on the City offices and on the medical office buildings <br />currently under construction rr in die approval process further west on Kelley Parkway. <br />We have had Phil Carlson of DSU sketch a conceptual site layout to help illustrate some of the <br />parameters described above. We haven’t attempted to determine whether this plan strictly meets <br />the City's development standards such u green space, parking, structural coverage, etc. It is <br />merely intended to show a site layout concept that follows the design parameten set out i n th is <br />letter. We have shown an 8.S00 i.f. strip retail building because that appears to be the largest <br />building for which parking standards could be met. <br />We arc excited about continuing to work with you toward an end product that meets City <br />expectations and provides for a successful commercial development. Once the joint Planning <br />Commission work session is concluded, if the response to the convenion to retail is positive, we <br />should get together as soon as possible to work out site plan issues. <br />If you have any questions, please contact me at 9S2-249-4600. <br />Sincerely, <br />Mike Gaffron <br />Planning Director <br />cc: Ron Moorse <br />City Council <br />Planning Commission
The URL can be used to link to this page
Your browser does not support the video tag.