Laserfiche WebLink
«04-2971 3229-3240 Watertown Roid <br />JiBaary 14.2004 <br />Pt|ti <br />Lot 2 as it exists is buildable. Staff would suggest that as a fonner occupied dwelling site, and based <br />on the 1990 subdivision conclusions. Lot 2 should not be charged a park fee. <br />Lot 1 is being re-platted to make it buildable. Should Lot 1 be charged a park fee based on today's <br />standards, as it is technically going to become a new record lot? Or. should it be treated as ha\ing <br />paid the park fee in 1990, and not owe anything fiirther? <br />Stormwater and Drainase improvements <br />Both lots drain directly to a creek which flows to Snibbs Bay. From a water quality standpoint, they <br />function as lakeshore lots. There is little ability to collect significant amounts of stormwater runoff <br />from either lot before it reaches the creek. <br />Stormwater treatment provisions should be added to the plan in the form of required substantial <br />buffer strips along the creek, which must remain vegetated with high grasses and not be fertilized. <br />As with the park fee, there is some question as to whether this subdivision should be subject to the <br />Storm Water and Drainage Trunk Fee established by City Ordinance. The fee is established at S2.700 <br />per acre, with a cap of 4.0 acres to be charged per lot. For this property. Lot 1 would be charged the <br />maximum 4.0 acre fee (S10.800) and Lot 2 would be charged for 3.47 acres ($9,369). However, a <br />case can be made that Lot 2 already exists as a viable building site, and the real intent of the <br />subdivision is to make Lot 1 buildable. An argument can be made that only the fee for Lot 1 should <br />be required. <br />Easement Vacation/Dedication. The proposal includes vacation of existing Drainage and Utilities <br />Easements granted with the original Senn Orono Addition, with rededication of new easements along <br />new lot lines, and newly described wetland casements to match the new wetland delineation. The <br />subdivision is subject to dedication of standard Diainage &. Utility Easements along lot lines. <br />Septic Tetting and Site Avaitabilit\> <br />Septic Systems Inspector Matt Bolierman has reviewed the submitted septic testing and confimM that <br />each lot has suitable sites for adequately-sized septic systems. The elevation of the sites in Lot 1 is <br />generally at least 1.5* or more above the 100 year flood elevation, and 3.5* above the delineated <br />wetland elevation. These sites arc located or can be slightly tweaked as necessary to mec» the <br />required 75* setback from the OHWL and other required setbacks. <br />Other Shoreland Standards <br />The slope near the south end of Lot 1 averages 29% at its steepest point, and therefore is not <br />considered a bluff. Tree removal (6" diameter or greater) within 75' of the creek is prohibited unless <br />permits are granted; the creek crossing may require tree removals which need to be reviewed once <br />a plan is submitted. As previously noted, hardcover and other variances will be required for the <br />creek crossing.