Laserfiche WebLink
e/A. /-V <br />IGEL LAW OFFICE <br />TOj MIKI C\l l RON,envoi ORONO <br />FROM: R.\(:IIU.IOU^^iQ <br />SUBJECT: Rl.gUl.sT IDR \ VRI WCK I OR WI ll.WO RJ>'IOR.\110N,CI‘1J.L‘M PROI’LRIY <br />DATE: 1/31/2004 <br />CuUum Property Address; 785 Femdale Roed North, VC'ayzata <br />Legal Description: <br />Site IdenuScation: <br />N 'A of the N£ V* of Secdon 36, Township 118 North, Range <br />23 West, Orono, Minnesou <br />Tract B, Regutcred Land Sur\-ey No. 1031, Hennepin <br />County, Minnesou <br />As described in the Wetland Delineation Report, dated No\-cmber I, 2002, the wetland <br />consists of a T)*pe 5 (PUBGx) pond in the western half of the propert}-, surrounded by <br />mowed Kentucky bluegrass lawn in all directions e.xcepi to the north and southwest, which <br />u dominated by common buckthorn and green ash trees. Based on a re^’iew of aenal <br />photographs, the wetland appears to have been excavated benveen 1953 and 1964, an <br />assessment that was supported by obsen*ations of the w etland durmg the December 14, <br />2001 and June 6,2002 site visits by Kjolhaug Environmental Services Company, Inc. <br />Dunng these visits, the wetland was ob$en*ed to consist of an open-w'ater pon^ which had <br />very little emetgent vegetanon around the edges, and the uplands were mowed to the w*ater's <br />edge. Water depths in the pond were assumed to be 1 to 2 feet. <br />As shown on the anached grading plan, the applicant proposes to construct a small berm in <br />the wetland along the western property line in order to provide substrate for the <br />establishment of emergent herbaceous and woody wetland vegeudon. A break in the berm <br />will maintain the existing drairugc of the wetland toward the southwest ui order to prevent <br />changes to the pond's water level. The berm was detemuned to be necessary because the <br />water depths along the western property line were too deep to allow woody vegetation to <br />become established. The proposed project would reesublish vegetanon around poruons of <br />the w*etland, and partially restore vegetation to the inner portions of the basin. The top <br />elevation of the betm will be no more than 1.0 foot above the norrrul water level of the <br />wetland, therefore, the project will result in no loss of wetland area. Although the project <br />will parnally restore the excavated wetland, the placement of 2,135 square feet (sO of Ell <br />maten.vl for the construction of the berm will be mingated through the creation of 2,135 sf <br />of new wetland adjacent to the existing wetland, and the esubUshment of 11,787 sf of nanve.