My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-2004 Planning Packet
Orono
>
Planning Commission
>
2004
>
02-17-2004 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 11:14:32 AM
Creation date
1/26/2023 11:06:49 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUIRED SUBMITTALS: <br />All of the foll(^ng information must be submitted by the application deadline date in order fcr yo <br />O' <br />O' <br />O'□ <br />B- <br />O' <br />Pre-Application Meeting Form, completed by a City Planner. <br />Completed Application Form <br />Completed Hardship Documentation Form <br />Certified Property Owners List - owners within 150' of the subject property, labels and plat ma <br />List, labels and map may be obtained from Hennepin County Department of Fmarc <br />Go\/ernmenl Center. A-603 300 South 6^^ Street. Minneapolis, telephone 612-348-5910 <br />Original Certificate of Survey (signed by a licensed surveyor), meeting ?I| the requiremen <br />listed Within this pacKet, including hardcover calculations. Also provide one coov 8 5" x 1 r <br />11" X17" for reproduction. 0«\9 vVeoo'v\Vv. <br />Completed hardcover calculation worksheets (as provided within the variance packet) <br />Topographic survey - including existing and proposed elevations. Provide one coov 8 5' x 1 <br />or 11" X 17" for reproduction. kx « i <br />Sketches or plans of floor and elevation views (provide one copy 8.5" x 11* or 11" x 17") <br />□ Additional items may be requested by City Staff depending cn the scope of the project." <br />APPLICANT’S ACKNOWLEDGEMENT: <br />The applicant hereby agrees to provide all information required or requested by the Plannir <br />Department, agrees to pay additional fees (staff time not covered in the original fee payme-'t) and/ <br />consultant expenses incurred in review of this application and certifies that the information supplied <br />true and correct to the best of his/her knowledge The applicant recognizes that he/she is solo <br />responsible for subrnitting a complete application being aware that upon failure to do so tl <br />Applicant’s Signature; <br />Applicant's Signature:\- <br />OWNER’S ACKNOWLED i^ENT: <br />Owner's Signature ^ <br />Owner's Signature: <br />Applicant must have all Amittals into the” City offices 25 days before the Planning Commss.t <br />/•-Vv <br />b il - - <br />* h?
The URL can be used to link to this page
Your browser does not support the video tag.