Laserfiche WebLink
r <br />nLE«»-296S <br />Januwy7.200« <br />htve revised their plan to extend no further into the side setback than existing resulting in <br />the request for a 2A2' setback where 30* is required. The requested side yard setback <br />variance of S.8* is in order to utilize the existing foundation on the south side of the <br />garage and continue the plane of the garage toward the rear yard to change the 3-staII <br />front loading to a 2‘Stall front loading and a 1-stall side loading garage. The applicants <br />have proposed this change as the result of the meetings with staff and their hope to <br />minimize hardcover on the lot <br />Note that while a major driveway expansion is proposed, hardcover limits will not be <br />exceeded. <br />LOT ANALYSIS WORSHEET <br />Lot AreaAVidth: <br />RR-IB Lot Area Lot Width <br />Required 87.210 s.f. (2 acre)200* <br />Actual 43,560 s.f. (1.0 acre)150* <br />Setbacks; <br />RR-IB Required Esbiing Proposed <br />Front 50*140*140* <br />Rear 50*no*no* <br />South Side 30’24.7*24.1’ <br />North Side 30*53*53* <br />Structural Coverage; <br />Total Lot Area Toul Structural Coverage <br />43.819 s.f (1.0 acre).Allowed: 6,572.8 s.f. (15%) <br />Proposed: 2.876 s.f. (6.5%) <br />ik