Laserfiche WebLink
f <br />1220 Tonkawa Shoreline Alteration <br />November 10,2004 <br />Page 3 <br />In the section titled Urban Area Policies for Natural Resource Management. Policy 2 states: <br />“2. Retention of natural vegetation will limit the impact of urbanization as <br />visible from the lake. Building heiglits will be limited to less than the typical tree height. <br />Minimum green belts will be provided with prohibitions against clearcutting or excessive <br />thinning of vegetation. Natural vegetation wilt be preserved on slopes. Retaining walls will <br />be discouraged except when absolutely necessary to prevent erosion, in which case they <br />will be screened with natural vegetation.” <br />Li regards to the upper wall, the City Engineer has indicated that from an engineering standpoint <br />the proposed plan is acceptable. However, from aji aesthetic standpoint, elimination of the upper <br />wall will be less visually intrusive. The Engineer has indicated to me verbal ly that the upper wal 1 <br />system could be eliminated as long as a 3:1 or flatter slope was maintained above the lower wall, <br />and natural vegetation with a strong root system was established at that location. <br />My basic issue with the project is loss of the natural grade of the shoreline, replacing it with the upper <br />retaining wall that may not be strictly necessary, and replacing the natural vegetation with contrived plantings <br />and a garden-like view rather than a natural look. A more natural look could could be accomplished by <br />eliminating the upper wall and replacing it with a gently sloped hillside at a 3:1 or flatter slope. <br />The primary area where excavation occurrcxl to lower the ‘hump ’ is between the two sets of mature black <br />oaks shown on the recent survey. It is my belief that the slope previously was uni fonn between the bases <br />of those two groupings of oaks, whereas after the grading it seems that just south of tire northern group is <br />a significant cut (which the submitted proposal would reinforce with a wall) and then a flat area to the base <br />of the southerly oak group. This area currently has an elevation of 936'-937‘, whereas our 1992 <br />topography and the actual surveyed tree base elevations suggest it sliould be a gentle slope from elevation <br />939' at the north end to 936.6' at the south end. The wall and stairway perpendicular to the shoreline <br />extending from the south end of the house, is of lesser concern to me but might be unnecessary if additional <br />fill was broughtmtotaperlhc grade furtlier south. This wall will only be minimally visible from the lake. <br />Applicants ’ cross section A1 - A2 is the primar>' area I would change if the intent is to re-establish the <br />original topographic screening. It could rise from tlie bottom of the steps (937.0) toward tlie shoreline 14' <br />to a point with elevation 938.0, then drop to the top of the lower wall (933.6) in a distance of <br />approximately 18', for a final slope of 18:4.4 or about 4:1. The slope parallel with the shore should be <br />uniform in a line between tlie two definitive oaks, and that line becomes the drauiage divide, llie only are;i <br />of concern is at the north end where this grading will have to blend in witli the more precarious slopes <br />remaining on the neighboring property. <br />Conclusion: I believe a grading plan can be devised that substantially restores the original topography <br />without resorting to an upper retaining wall, allowing for a more natural looking shoreline, allowing for <br />replanting ofscreening and bank stabilization vegetation to reduce the visual impiict of the home ’s close <br />proximity to the lake, and that is more in line with the City’s policies.