My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-08-2004 Council Packet
Orono
>
City Council
>
2004
>
11-08-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 3:38:50 PM
Creation date
1/25/2023 2:05:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Nov 03 2004 10i23 BONESTROO ROSENE RNDERLIK 6516361311 P.l <br />Bonestroo <br />Rosene <br />Anderiik& <br />Associates <br />Engineers & Architects <br />2335 west Highway 36 • St. Paul. MN 55113 <br />orrice: 65I-636-4600 • Fax; 6SI-636-13II <br />wwwJ)onestroo.com <br />EXHIBIT D <br />Noveniber 3,2004 <br />Ms. Janice Gtmdlacb <br />Planner <br />City'ofOrono <br />Post OCBce Box 66 <br />Ciystal Bay, MN SS323 <br />4475 Forest Lake Landing <br />File No. 139-04-000 <br />Plat No. 04-3054 <br />Dear Janice; <br />We have reviewed die revised site plan dated 10-28-04 for the proposed iraproveoients to 4475 Forest Lake Landing. The <br />proposed inoproveinents include site grading, removing an existing residence and constructing a new home. The <br />topography of this site makes drainage issues a challenge to deal with effectively. We have the following comments with <br />rega^ to engineering matters: <br />• The proposed plsuis shown retaining walls along the northwest and southeast lot lines. The walls are shown <br />constructed on the lot lines. It is unclear how these walls can be constructed without easements from the <br />neighboring properties. The city should review and comment on required set backs for retaining walls (5-feet?). <br />e The stated purpose of the retaining wall along the southeast lot line is to channel storm water to the street In <br />general it is iwt a sound engineering practice to direct water to the base of a retaining wall. We recommend that <br />a deuiled retaining wall design be submitted that shows how the base of the wall will be protected from the <br />water undermining it. The detail should also address proposed permanent erosion control measures. <br />• The final plans should identify proposed top and bottom of retaining wall elevations as well as wall materials. <br />• It appears that storm water will be directed from the southwest to the northeast onto the southwest side of the <br />pool deck. Plans should be revised to direct storm water around the pool deck. <br />• The driveway is shown at a 10% grade. This is the maximum recomnended driveway grade and should not be <br />exceeded when constructed. <br />• The proposed slopes south and east of the driveway are shown at 2:1. The maximum recommended slope for <br />maintenance (mowing) reasons is 3:1. We reconunend that the grading plan be revised to reduce all proposed <br />slopes to a 3:1 maxiiruun. <br />• The proposed silt fence should be the heavy duty type with steel t-posts. A note should be added to the plain <br />stating that the erosion and sediment controls are to be installed, iiupectcd and approved by the city prior to any <br />work on aite. <br />If you have any questions please call roe at (651) 604-4863. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLDC & ASSOCIATES, INC. <br />Tom Kellogg <br />Co: Greg Gappa, CityofOrono <br />Bruce Vang, Ci^ of Otono <br />• St. Paul. St. Cloud. Rochester, Willmar. MN • Milwaukee, Wl • Chicago, IL <br />Afflrmjrlv* ActJon/ff<|ual Opportunity Cmploytf fmployoo Ournotf
The URL can be used to link to this page
Your browser does not support the video tag.