My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-2004 Council Packet
Orono
>
City Council
>
2004
>
09-13-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 1:14:58 PM
Creation date
1/25/2023 12:18:28 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
No.Item Unit <br />Contract <br />Quantity <br />Unit <br />Price <br />Current <br />Quantity <br />Quantity <br />to Date <br />Amount <br />to Date <br />1 <br />STUBBS BAY ROAD EROSION IMPROVEMENTS: <br />CLEAR. GRUB. EXCAVATE EXISTING CHANNEL.LS 1 1000.00 1 $1,000.00 <br />2 <br />REMOVE DEBRIS. AND ADO TOPSOIL AS NEEDED <br />CREATE RIFFLE POOLS AND/OR SETTLING AREAS EA 5 275.00 5 $1,375.00 <br />3 WIDEN. SHAPE AND COMPACT CHANNEL BY DESIGN LS 1 2500.00 1 $2,500.00 <br />4 ADO AND PLACE FIELOSTONE TYPE RIP RAP FOR CY 75 15.00 75 $1,125.00 <br />5 <br />DRAINAGE AND/OR SETTLING POOLS <br />PLANTINGS AND LIVE STAKES EA 348 6.50 348 348 $2,262.00 <br />6 SEEDING AC 0.1 5000.00 0.1 0.1 S500.00 <br />7 SILT FENCE. MACHINE SLICED LF 100 4.00 100 $400.00 <br />8 EROSION CONTROL BLANKET MNDOT 3082 CAT.3 SY 200 2.50 200 $500.00 <br />9 EROSION STABILIZATION MAT MNDOT 3888 CL 3 SY 150 8.18 150 $1.227 00 <br />Total STUBBS BAY ROAD EROSION IMPROVEMENTS: <br />STUBBS BAY ROAD EROSION IMPROVEMENTS: - Bid Amount Total - S10.889.00 <br />S10.689.00 <br />Total STUBBS BAY ROAD EROSION IMPROVEMENTS:$10,889.00 <br />Total WorH Completed To Dale $10,889.00 <br />...A
The URL can be used to link to this page
Your browser does not support the video tag.