Laserfiche WebLink
Nothing herein contained shall prevent the City of Orono from taking such other lawful action as is <br />necessary to prevent or remedy any violation. Such actions may include but are not limited to: <br />In responding to a suspected Ordinance violation, the Planning Director.and Local <br />Govcmmeiit may utilize the full array of enforcement actions available to it including but <br />not limited to prosecution and fines, injunctions, aftcr-the-fact permits, orders for corrective <br />measures or a request to the National Flood Insurance Program for denial of flood insurance <br />availability to the guilty party. The Community must act in good faith to enforce these <br />official controls and to concct Ordinance violations to the extent possible so as not to <br />jeopardize its eligibility in the National Flood Insurance Program. <br />When an Ordinance violation is either discovered by or brought to the attention of the <br />Planning Director, the Planning Director shall immediately investigate the situation and <br />document the nature and extent of the violation of the official control. As soon as is <br />reasonably possible, this information will be submitted to the appropriate Department of <br />Natural Resources' and Federal Emergency Management Agency Regional Office along with <br />the Community's plan of action to correct the violation to the degree possible. <br />The Plaiming Director shall notify the suspected party of the requirements of this Ordinance <br />and all other official controls and the nature and extent of the suspected violation of these <br />controls. If the structure and/or use is under construction or development, the Planning <br />Director may order the construction or development immediately halted until a proper permit <br />or approval is granted by the Community. If the construction or development is already <br />completed, then the Planning Director may either: (!) issue an order identifying the <br />corrective actions that must be made within a specified time period to bring the use or <br />structure into compliance with the official controls, or (2) notify the responsible party to <br />apply for an after-the-fact pennit/development approval within a specified period of time not <br />to exceed 30-days. <br />If the responsible party does not appropnately respond to the Planning Director within the <br />specified penod of time, each additional day that lapses shall constitute an additional <br />violation of this Ordinance and shall be prosecuted accordingly. The Planning Director shall <br />also upon the lapse of the specified response period notify the landou-ner to restore the land <br />to the condition which existed pnor to the viol.ition of this Ordinance. <br />DIVISON13. AMENDMENTS <br />See. 78-1139 Floodplain Designation <br />The flood plain designation on the Official Floodplain Overlay District Map shall not be removed <br />from flood plain areas unless it can be shown that the designation is in error or that the area has been filled to <br />or above the elevation of the regulatory flood protection elevation and is contiguous to lands outside the <br />flood plain. Special exceptions to this rule may be permitted by the Commissioner of Natural Resources if <br />he determines that, through other measures, lands are adequately protected for the intended use. <br />Sec. 78-1140 Amendments <br />All amendments to this Ordinance, including amendments to the Official Floodplain Overlay District <br />Map, must be submitted to and approved by the Commissioner of Natural Resources pnor to adoption. <br />Changes in the Official Floodplain Overlay Distnct Map must meet the Federal Emergency Management <br />Agency's (FEMA) Technical Conditions and Criteria and must receive prior FEMA approval before <br />S DUirici-J Map: 1/1/2004 rtvision -22- <br />{