Laserfiche WebLink
Lot 1: The required side setback to Lot 2 shall be changed to 30’. The rear <br />setback may remain as 50 ’ to the west lot line, i.e. the rear setback <br />line is coincident with the Consci-vation Easement boundary. <br />Lot 2: Tlie required side setback to Lots 1 and 3 shall be changed to 30'. <br />The rear (west) setback may remain as 50' to the west lot line, i.e. the <br />rear setback line is coincident witli the westerly Conservation Easement <br />boundary. The location of the required 75 ’ setback from the bank of <br />the creek shall be shown. The bank of the creek shall be established <br />as the 936.5 ’ contour line for administrative purposes. <br />Lot 3: The required side setback to Lots 2 and 4 shall be changed to 30'. <br />The existing house setback to Lot 3 ’s northeasterly boundary shall <br />be recognized as a legal nonconfonnity. The rear (south) setback shall <br />be shown as 50 ’ from the southerly and southeasterly lot lines. The <br />location of the required 75 ’ setback from the bank of the creek shall <br />also be depicted. The bank of the creek shall be established as the <br />936.5' contour line for administrative purposes. <br />Lot 4: The required side setback to Lots 3 and 5 shall be changed to 30'. <br />The rear (southeasterly) setback shall be shown as 50' from the <br />southeasterly lot line. <br />Lot 5: The required side setback to Lots 4 and 6 shall he changed to 30'. <br />The rear (easterly) setback shall be shown as 50 ’ from the easterly lot <br />line. <br />Lot 6: The required side setback to Lots 5 and 7 shall be changed to 30'. <br />The rear (easterly) setback shall be shown as 50 ’ from the easterly lot <br />line. <br />Lot 7: The required side setback to Lot 6 shall be changed to 30’. The rear <br />(easterly) setback shall be shown as 50' from the easterly lot line. The <br />northwesterly setback shall remain as 30’, coincident with the 30* <br />proposed drainage and utility easement. <br />Pages of 13