Laserfiche WebLink
The installation of curb and gutter along both the north and south sides of fiirch Lane, and re­ <br />grading the street to include a crown in the center, was discussed. The consensus was that this <br />solution was the most equitable and would increase the gutter capacity to convey water down <br />to the naldur Park Road intersection. <br />Proposed Project <br />I he proposed project is to install surmountable concrete curb (curb that can be easily driven <br />over) along the first 250 feet of Birch Lane to prevent the water in the street from Bowing <br />towards the hou.ses and garages. The road will be re graded and crowned, so the water flow's <br />into the curb and gutter along both sides of the street. There will be new, more efficient catch <br />basins installed on both the north and south sides of Birch l.ane at the Ihildur Park Road <br />intersection. The existing storm sewer pipe along Baldur Park Road will continue to convey <br />the flow from the catch basin on the south side of Birch Lane, and a new pipe will be installed <br />to convey the flow from the catch basin on the north side of Birch Lane. This will pn)vide for <br />additional flow capacity from the intersection area <br />Project Options <br />1 here arc several options for the installation of the storm sewer pipe neces.sary to convey the <br />flow from the catch basins on each side of Birch Lane at the Baldur Park Road intersection. <br />Itach provides a similar increase in storm water flow capacity. Lach option also has its own <br />set of advantages and disadvantages. <br />1 he option ol connecting both catch basins to the existing 8" storm sew'cr pipe that runs to the <br />south along Baldur I’ark Rt»ad was dropped from consideration because of the limited capacity <br />of this pipe <br />New Pipe it) Baldur Park Road <br />One viable option would be to install a new 12" pipe in Baldur I’ark Road to ct>nvcy the <br />drainage from the north side of Birch I.anc. This new pipe would be parallel to the existing 8" <br />pipe that is located along the eastern edge of Baldur I’ark Road. These two pipes would then <br />both drain into an existing 15" culvert under North Slu>ie Drive which outlets to Crystal Bay. <br />The advantages of this option are that it does not require any easements or removal of existing <br />landscaping, and it provides increased capacity Ihe disadvantages are that it increases the <br />amount of storm water flow directly into Crystal Bay. requires the excavation and restoration <br />of a pin tion of lialdur Park Road for the installation of the storm sewer pipe under the road, <br />and increased street maintenance caused by the pipe under the load moving up and down with <br />the free/e and thaw cvclc. <br />Pace 2 of 4