My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-12-2004 Council Packet
Orono
>
City Council
>
1950-2024
>
2000-2009
>
2004
>
07-12-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 11:21:14 AM
Creation date
1/25/2023 11:15:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, June 28,2004 <br />7:00 o’clock p.m. <br />(PVBUC COMMENTS, Continued) <br />Mr. Nusbauni stated that he wished to provide the C'ouneil with an update of what's been going on, <br />since he liclievcd they were unaware that little has been done and stones diller Since the old <br />natural How was changed 10 years earlier with the resurfacing project, the then new How ran past <br />their property to the west. This natural lluw of water to the west worked adequately until the new <br />construction to the west was allowed to bring in enormous amounts of fill, which stopped the flow <br />entirely. <br />Mrs. Nusbaum pointed out that, just four years earlier, they were forced to follow the rules laid out <br />by the City for their construction project, and now this new project has hailed the How. She <br />maintained that her projicrly cannot accommodate theenliie runoff for the whole neighborhood. <br />As nothing has changed in 10 years, Mr. Nusbaum voiced his concern that once again their <br />concerns will be put off, tall will come, and noUung will be done once again. <br />While slated that he wished he could come up with a solution, but indicated he must rely on what <br />the engineers tell him. He indicated that |K*rhaps City staff has been working on some solutions the <br />Council and Nushaums were unawate of. <br />Sanscvcrc questioned what the lluw will be after construction. <br />Mrs. Nusbaum staled that the final grade is anticipated to be complete this week. <br />Moorse asked < iappa to explain their design solutions to the Council and issues regarding <br />casements. <br />(iappa slated that there are several drainage pr»»blems. Water comes rushing down Biich I ane and <br />onto their pro|>erly since the asphalt iH-rm is smushed He has ilex eloped a set of options for <br />diverting the water to the corner via a pipe. Having sent letters to some of the neighbors regarding <br />one ol the options, (iappa stated that txx o of the ncighbois liaxe xoiccd their op|H).sitiun to the <br />proposal. With regard to the option of con.strucling a parallel pijK* down Baldur I’k. Kd , (iappa <br />staled that this i.s another viable option, (iajrpa stated that much of the problem centers on the fact <br />that It IS very Hal at Birch and Baldur, which makes it difficult to handle heavy xolunies ol Water. <br />McMillan pointed out that the asphalt bcmi was not meant to be a pennanent solution. <br />(iappa stated that il the easements don't work they may consider taking the water out Baldur Pk. <br />Kd. to ilireci it to North Shore Ibive. <br />Sanseveie staled that tins has been going on for years already and questioned xvhether the City <br />should consider condemnation to run the pi(K‘ underground. <br />While asked if the City could help w ith a solution for bigger capacity. <br />Kellogg siaicil that althougli they would like to take the water out two ways at Biich and Baldur Pk, <br />Kd,, they would need to crown the load to run the water ilown both sides of the road and thru two <br />pipes in two dilfercnt diiection.s. <br />page: 8 of 10
The URL can be used to link to this page
Your browser does not support the video tag.