Laserfiche WebLink
No. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />8 <br />10 <br />11 <br />12 <br />13 <br />14 <br />Item <br />PART 1 . BASE BID; <br />1-1/2'HOPt. SDR 11 DIHrCKONAt DRIILFD <br />2" HOPE SDR 11 DIRECTIONAL DRILLED <br />MM* HDPF. SERVICE PIPE SDR 11 DIRECTIONAL DRILLED <br />1-1/4* CURB Stop AND BOX <br />2* ISOLATION VALVr <br />CONNECT TO EXISTING FORCE MAIN <br />BITUMINOUS TRAIL PATCH <br />TERMINATION FLUSHING CONNECTION <br />HUSHING CONNECTION <br />CLEAR AND GRUB <br />SILT FENCE. REGULAR <br />SODDING. I AWN TYPE, <br />MNDOT SEED MIX fiOA <br />WOOD FIBER BLANKET <br />Tolol PARI 1 ■ BASE BIO <br />PART 1 - BASE BIO: • OhJ Amount ToUil • S34.914 50 <br />Contract Unit Current Quantity Amount <br />Unit Quantity Price Quantity to Date lo Oato <br />LF 41U 10 45 410 $4.284 50 <br />LF 1400 1045 1400 $14.630 00 <br />LF 300 1145 287 $3,286 15 <br />FA 7 950 00 8 $7.600 00 <br />LA 1 7G5 00 1 $765 00 <br />LA 1 850 00 1 $850 00 <br />SY 60 1000 50 50 $500 00 <br />LA 1 117500 1 $1.17500 <br />LS 1 57500 1 $57500 <br />LA 1 ;^50 00 1 $250 00 <br />LF 300 200 $0 00 <br />SY 500 100 500 500 $500 00 <br />AC 05 500 00 05 0.5 $250 00 <br />SY 300 1 50 ICO 160 $240 00 <br />$34,905 65 <br />Total PART 1 • BASE DID.$.34,905 65 <br />Tolal Work Cumplulocl To Datn $34,905 65 <br />1