My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-2004 Council Packet
Orono
>
City Council
>
2004
>
06-28-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 12:17:53 PM
Creation date
1/25/2023 10:31:39 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Coi ^^cpTING <br />JUN 2 8 2004 <br />CITY OF ORONO <br />REQUEST FOR COUNCIL ACTION <br />DATE: June 28,2004 <br />ITEM NO.// <br />Department Approval: <br />Name Grcgor>'A (iappa <br />Title Director of Public Services <br />Admini.<ttrator Reviewed: Agenda Section: <br />Public Services Director's Report <br />Item Description: Purchase Backup Dialenlbr the Sewer SCADA System <br />We recently c.xpcrienced a sewer backup into the basement of a home on Baysidc Road w hich w as <br />caused by failure of the West Luke Street lifi station. This lift station is one of the ten .stations that <br />have the SC!ADA automated alarm system installed, fhe SC'ADA system did register the lift station <br />malfunction and successfully sent an alarm signal to the public works garage. However, the dialer <br />system software did not work properly, and the public works on call person was not notified of the <br />alarm. We have been experiencing a sporadically reoccurring problem with the dialer system. The <br />vendor is having a difficult time finding the problem because when he comes to fix the problem <br />everything works successfully. We are continuing to work on solving this problem, but are <br />concerned about the total reliability of the dialer system. <br />The existing Navarre water plant control system has an alarm and dialer system, which has been <br />functioning fine since 1 999, to notify the public works on call person of problems at the water plant. <br />This w ater plant system could be expanded to function as a backup dialer system in the event of a <br />failure of the SCADA .system. The SCADA system provides detailed alamis on lift station problems <br />while the water plant backup system would only provide a general alarm notification of a problem at <br />a particular lift station. <br />Our recommendation is to purehasc a backup alarm dialer system for the SCADA system from <br />Automatic Control Systems for a cost of $7,798. W'e will also continue to work on solving the <br />problem with the SCADA system dialer. This backup dialer will provide an additional level of <br />protection in order to further reduce the potential for sewer backups, fhe cleanup and restoration <br />costs for one sewer backup could easily exceed the costs of the dialer system. In addition, it would <br />prevent the homciiwner inconvenience and difficulties caused by sewer backups. <br />COUNCIL ACTION REQUESTED: <br />Motion to approve the purcha.se of a backup dialer for the SCADA system from Automatic Systems <br />Company. Roseville, Minne.sota. in the amount $7,798, to be funded from the 2004 Sewer Lund <br />Budget, w ith approval of a budget ad justment to reflect this expenditure.
The URL can be used to link to this page
Your browser does not support the video tag.