Laserfiche WebLink
Mail Q7 2004 7:38RM HP LASERJET 3330 p.2 <br />4. Saaltaiy SewerAVater Main: Proposed sewer and water services are to be provided by the City ofLong <br />Lake. The ipplioast provided a letter from Long Lake indicating that sewer and water connections to their <br />system are possible provided legal issues can be resolved and an agreement can be executed between <br />Orono and Long Lake. We recommend that the agreement for sewer and water service from Long t rWkp be <br />in place prior to final plat approval. Final plans should include plan and profile views of the sanitary sew» <br />and water main. All utility details shall comply with the City of Orono engineering standards. <br />5. Easements: The perimeter lot easements shown appear to be appropriate. Drainage easements should be <br />provided across all wetlands, drainage ways and pond areas. Some easements shown need to be revised to <br />include existing wetlands. The site is located east of South Brown Road, south of Long Lalce and <br />north of the Luce Lino trail in the northeast quarter of Section 3. We have the following <br />cooimeats in regards to engineering matters. <br />6. Financial Guarantee: When the plans have been completed we will prepare an estimate of the total cost <br />for the site improvements to detemiine the amount of ^e financial gxiarantee required. <br />If you have any questions please call me at (651) 604«4863. <br />Yours very truly. <br />BONESTROO, ROSENE, ANDERLDC it ASSOCIATES. INC. <br />Tom Kellogg <br />Cc: Greg Gappa, City of Orono <br />r