Laserfiche WebLink
r <br />A <br />CITY OF ORONO <br />2750 Kelley Parkway <br />P.O. Box 66 <br />Crystal Bay, MN 55323 <br />(952) 249-4600 <br />ZONING FILE #04-3016 <br />NOTICE OF PLANNING COMMISSION ACTION <br />DATE OF NOTICE: May 21, 2004 <br />TO:Henry Lazniarz COPIES: Charles & Sue VanEeckhout <br />Wayzata Design & Development 120 Brown Road South <br />1117 Marquette Ave. South, Suite 2509 Long Lake, MN 55356 <br />Minneapolis, MN 55403 <br />Tom Goodrum <br />Schoell &. Madson, Inc. <br />10580 Wayzata Blvd., Suite 1 <br />Minneapolis, MN 55305 <br />TYPE OF APPLICATION: Preliminary Subdivision / PRD <br />DATE OF MEETING: May 17, 2004 Vote: 5 In Favor 2 Against <br />Planning Commission recommended approval of tlie proposed subdivision, based on the following <br />findings or subject to these recommended conditions: <br />1.Plamung Commission finds that the Planned Residential Development (PRD) subdivision <br />approach is appropriate for this property based on the various environmental factors present <br />including steep topography, creek, wetlands, etc. <br />2.Planning Commission accepts the proposed 7-lot plat on 14,0 dry buildable acres and accepts <br />the proposed lot sizes, configurations and setbacks. Planning Commission concludes that <br />the slopes of greater than 18% in the area to be developed arc of relatively short length and <br />they should not be excluded from allowed land alteration nor should they reduce the acreage <br />of the developable area. <br />3.The areas to be preserved via conservation easements or similar open space dedications may <br />be in the form of easements covering multiple individual properties rather than within one or <br />more platted outlets. <br />4.No formal or joint access to the Luce Line should be provided; any individual access points <br />should be informal. <br />5.Approval is subject to the standard Park Dedication Fee, subject to recommendation of the <br />Park Commission (will be scheduled for review at Monday, June 7 Park Commission meeting). <br />6. Approval is subject to the standard Storm Water and Drainage Trunk Fee. <br />i