Laserfiche WebLink
> <br />fl <br />Development Fees - PUD #4 <br />April 8,2004 <br />Page 2 <br />In 1989, as a result of the 1987 CMP amendment, water and sewer facilities ’• jre constructed in the <br />Highway 12 area to provide capacity for the expected development north of Highway 12. These sewer <br />and water units were not assessed to vacant property and are due as a unit connection charge upon <br />development. Up to and including2000, this S&W connection fee was charged on a juu! basis, and for <br />2000 was $3,645 per unit for sewer and $5,050 per unit for water. In 2001 the fee was restructured to <br />be an acreage charge, based on gross acreage (including wetlands). For 2004, the sewer connection fee <br />is $5,510 per acre and for water is $9,110 per acre, for a total S&W connection charge of $14,620/acre. <br />The Sewer and Water Connection Charges that will be due for Lot 2, Block 1, City of Orono Addition, <br />are calculated as follows: <br />2.56 acres x $ 14,620.00 per acre = $37,427.00 <br />III. Stormwater Drainage Trunk Fee <br />The clinic development will be subject to the City’s recently enacted Storm Water Trunk Fee. At the <br />current 2004 Fee Schedule commercial rate of $6,480 per acre, the site will be charged for 2.56 acres or <br />a total fee of $16,588.80. <br />'.-i <br />is.'■ -J....