Laserfiche WebLink
exterior elevation attached as Sheet A4 of Exhibit A. The trash enclosure shall bt <br />constructed of materials consistent with the principal structure on the Property per <br />the approved plans. <br />Construction of the medical office building shall be in conformance with the <br />building codes and regulations adopted by the City of Orono. Any substantial <br />changes to the gross square footage, footprint/wall/roof dimensions or defined <br />building height shall require a prior amendment to this Agreement. <br />6.Landscaping. The approved landscaping plan attached to this Agreement as <br />Sheet LI shall be strictly adhered to, with the following conditions: <br />a)City reserves the right to require revision to the tree species and tree <br />locations proposed along the Kelley Parkway frontage to ensure their <br />compatibility with the final Kelley Parkway strectscape plan yet to be <br />approved by the City Council. <br />The trash enclosure shall be further screened by vegetation to minimize <br />direct view of the opening by westbound Highway 12 traffic, subject to <br />City staff approval. <br />7.Lighting. Site lighting shall adhere to the approved lighting plan attached to this <br />agreement as Sheet LI. <br />8.Signage. Signage on the site shall be limited to the required traffic control signage <br />and a monument style sign, which must receive a separate review and pennit prior <br />to construction. Parking and traffic control signage shall be installed subject to <br />City staff and City Engineer approval. <br />B. Installation and Malatenapce of Improvements <br />9.Improvemen ts: In accordance with the policies and ordinances of the City of <br />Orono, the following described public or private improvements (hereinafter <br />collectively called the “Improvements") shall be constructed, installed and <br />maintained by the Developer according to the terms and conditions contained in <br />this PUD Agreement: <br />Site grading, driveways, curb and gutter, parking lots, sidewalks, retaining <br />walls if required and all necessary erosion control measures per the <br />Grading, Drainage, Erosion Control, and Utility Plan attached hereto as <br />Sheet Cl (hereinafter called "site grading improvements"); <br />Construction of sanitary sewer and water connections (hereinafter called <br />"sewer and water improvements") and construction or relocation of storm <br />sewer lines and facilities (hereinafier called “stormwater improvements ”) <br />per the preliminary Utility Plan attached hereto as Sheet Cl anJ C2. <br />Page 3 of 10 <br />-***----1