Laserfiche WebLink
Date Application Received: 3-17-04 <br />Date Application Considered as Complete: 4-14-04 <br />60-Day Review Period Expires: 8-12-U4 <br />MAY 1 0 2004 <br />City of OHOfvo <br />REQUEST FOR COUNCIL ACTION <br />Date: Mav 2. 2004 <br />Item No.: <br />Department Approval: <br />Name: Janice Gundlacli^ <br />Title: City Planner <br />Administrator Approvai:Agenda Section: <br />Zoning <br />Item Description: #04-3003, Bruce and Kris Paddock & George W. Stickncy, 3250 Fox Street <br />- Preliminary Plat Resolution <br />Zoning District: <br />Lot Area: <br />Lot Width: <br />LR - 1 A, One Family Lakeshore Residential District (2 acre minimum) <br />14.830 acres (645,995 s.f.) <br />Approximately 834 feet <br />List of Exhibits <br />A - Resolution per Planning Commission Recommendation <br />B - PC Action Notice 4-21-04 <br />C - PC Memo and Exhibits of 4-15-04 <br />Application Summary: Applicant requests preliminary plat approval to create 3 lots on <br />one block at 3250 Fox Street to be known as Maxwell Bay Estates. <br />Sta/f Recommendation: Staff recommends approval of the preliminary plat with the <br />following stipulations: <br />1. Only two new driveways are proposed on the private section of Fox Street and <br />proposed lot 3 must use the existing driveway that exists outside the Fox Street gates. <br />2. Proposed lots 1 and 2 should utilize the septic sites on the street side of the proposed <br />house pads rather than the lake side sites. <br />3. The average lakeshore setback line shown on the preliminary plat shall be the line <br />used to determine the average lakeshore setback for all 3 lots, not an average setback <br />that is determined by when which lots construct houses. <br />4. If the existing mound is proposed to stay during the interim period, a temporary <br />easement, expiring at the time of site grading for proposed lot 1. may be permitted but <br />only by approval of the City. <br />5. Implementation of the recommendations of the City Engineer. <br />6. Compliance with the requirements of the Minneha^ Creek Watershed District. <br />7. Submission and approval of the final plat. <br />8. Payment of standard fees and dedication of required easements. <br />9. Review by the Park Commission prior to City Council review. <br />L.