Laserfiche WebLink
Date Application Received! 2>23>04 <br />Date Application Coniidercd at Complete: 2-23-04 <br />60-Day Review Period Expires; 4-23-04 <br />To: <br />From: <br />Date: <br />Subject: <br />Chair Mabusth and Planning Commissioners <br />Ron Moorsc, City Administrator <br />Mike Gaffron, Planning Director <br />April 16.2004 <br />#04-2997 City of Orono - Access Between Lots 38 «Sc 39, Morse Island Park <br />(120-140 Big Island) - CUP and Variance for Wetland Alteration - Continuation <br />of Public Hearing <br />List of Exhibits: <br />A - PC Draft Minutes 3-15-04 <br />B - Notice of PC Action 3-22-04 <br />C - Memo and Exhibits of 3-12-04 <br />Application Summary: As a result of numerous requests from property owners on Big Island, and as <br />a result of the previously used adjacent access road bejng converted to lawn by its owner, the City is <br />requesting a variance and a conditional use permit to allow the filling of a small portion of wetland and <br />fto^plam to allow construction of a new driveway for vcliicular access fixjm tire lakeshore to the interior <br />platted road system. <br />Current Status: This item was tabled on March 15 because Public Services Director Greg <br />Gappa was not present. Planning Commission recommended that this not be brought back <br />until staff meets with the residents of Big Island and can present a comprehensive plan for <br />establishing/upgrading all three potential access points. <br />Staff Recommendation: Staff recommends approval of the proposed wctla.nd alterations absent tire <br />suggested meeting with residents. The Council has indicated no intent at this time to address furtlicr <br />access issues or proceed toward opening a third access point. <br />Background <br />In March of2003, the Council invited a group of Big Island residents to a work session to discuss the <br />access issue. At that meeting, the consensus of the residents, and ofthe Council, was that the access lane <br />that was closed by Mr. Uran should be replaced on the adjacent City right-of-way lane. Since that time, <br />the Council has authorized a wetland delineation and a feasibility study in preparat-on for construction of <br />the access. These have been completed. The only step remaining is the CUP for filling in the 0-75 <br />lakeshore zone. <br />Most recently, the Council discussed this issue at its April 8,2004 work session. Tire Council confirmed <br />its support for the access lane. The Council also indicated its intention to limit the number of access lanes <br />open on Big Island to the minimum number necessary to provide minimally adequate access. Minimizing <br />the number of access lanes will minimize the amount and impacts of motor vehicle usage on the <br />Island.