Laserfiche WebLink
DATE: Match 22,2004 <br />ITEM NO: 3 <br />REQUEST FOR COUNCIL ACTION <br />C/fy^ "^^004 <br />Department Approval: <br />Namt Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed:Agenda SectionrC; <br />Public Service Director's Report <br />Item Description: Assessment Hearing for West Farm (Homestead) Sewer Project- Resolutions <br />This assessment hearing is for a project to install a pressure sewer system to serve the West Farm <br />(Homestead) neighborhood. The hearing is scheduled for 7:00 p.m. The proposed assessment is <br />$6,400 per property for the seven properties in the project. The assessment is for a 15-year time <br />period at an interest rate of 6.25% which results in an annual payment of approximately $650 per <br />year. The attached legal notice for the assessment hearing was published in the March 1” <br />Laker/Pioneer newspaper, and a letter was sent to each property owner notifying them of the <br />assessment hearing. <br />There are seven properties in the project area. One property is undeveloped, five properties <br />have nonconforming septic systems, and one property has a conforming septic :ystem. City <br />policy allows property owners with a conforming septic system to request exclusion from the <br />project assessment, and the City will then finance the assessment debt service co.'d until the <br />property does connect to the sewer system, 'fhe property owner may continue to use the <br />conforming septic system until either the system fails, or a new or expanded house is <br />constmeted, at which time connection to the sewer system is required. Payment of the current <br />sewer connection fee is then required before a sewer connection permit is issued. <br />The initial sewer connection fee is based on the project assessment, and the connection fee is <br />then increased by a cost of living adjustment every year. A property owner with a conforming <br />septic system may also elect to be assessed for the sewer project and continue to use the <br />conforming septic system until connection to the sewer is required for one of the following <br />reasoits: either the system fails, or a new or expanded house is constructed on the property. The <br />one property owner with a conforming septic system has contacted the City regarding possible <br />exclusion from the project assessment <br />Cormection to sewer, for properties with nonconforming septic systems, is required by December <br />31, 2007, which is the city-wide deadline for the replacement of nonconforming septic systems <br />which are in the Shoreland zorw. Connection to sewer before the deadline is required when either <br />the septic system fails, or a new or expanded house is constructed. <br />fhe assessment amount does not include the cost of making the connection from the home to the <br />sewer line, or the cost of a grinder pump needed by each property. The cost for the grinder pump <br />is approximately $7,000. The cost of the private service connection can range from $3,000 to <br />$5,000 or more, depending on the distance and topography. <br />Asiessmcnt Appeal Procedure <br />n