My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-22-2004 Council Packet
Orono
>
City Council
>
2004
>
03-22-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 8:54:44 AM
Creation date
1/19/2023 3:25:48 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />M4-2974 StOBtbay MArketpUct <br />iMuary 16,2004 <br />PagtSofO <br />Acceaa and circulation plan. The proposed site plan meets the City’s established standard <br />for no direct access to Highway 12 between Willow Drive and Old Crystal Bay Road. <br />The qyplicants are proposing a right-in, right-out access to Willow Drive and a full access <br />to Kelley Parkway, which will be further discussed as the renew process moves forward. <br />Trail links are provided as called for in the City’s plans and in the Stonebay approvals. <br />Interior site circulation is a major concern which requires additional discussions between <br />staffs ^plicants and consultants. <br />Sanitary Sewer and Municipal Water must be available. They are. Coimection charges for <br />the site were established at the time of the Stonebay PUD s^provals. <br />Stormwater ManaaementThe code requires that a stonnwater management plan be submitted <br />and be in compliance with City standards. All stormwater from the site will be directed to <br />the regional pond immediately west of the site which was designed with edacity for <br />development of this site. <br />Building Design and Constmetion . This section addresses the exterior wall finishes, <br />architectural compatibility of future additions and outbuildings, and prohibits temporary <br />buildings. The proposal generally spears to be in compliance with the pertinent standards. <br />Development Agreement . The ordinance requires that all rezonings within the Highway 12 <br />Corridor are subject to a Development Agreement assuring compliance with the code <br />requirements. Unique to this site is the intent to create multiple lots with individual <br />ownerships, using shared infrastmeture. The ^)pUcant has suggested that separate <br />Agreements be established for each of the three lots, which should be feasible but adds to the <br />administrative complexity of the approval process. <br />UI. PreUmlnary Plat <br />The proposed plat would create three building lots, one for each proposed building, with each lot <br />fronting on two roads. Access and other site functions will necessarily be shared between the three <br />parcels, requiring shared parking agreements, for instance. <br />Plat tqjproval will include the establishment of drainage and utility easements, payment of park fees <br />and stormwater & drainage trunk fees (both established as part of the previous Stonebay PUD <br />approvals), etc. Preliminary plat approval will be concurrent with site plan approval.
The URL can be used to link to this page
Your browser does not support the video tag.