Laserfiche WebLink
o Detailed schedule indicating dates and sequence of land alteration activities, <br />implementation, maintenance and removal of erosion and sedimentation control measures <br />and permanent site stabilization measures <br />Rule D: Wcdand Protection (applies to ail projects where there is wetland on the subject property) <br />Provide a site plan which indicates the location of all wetlands on the subject property <br />Provide a wetland delineation report <br />All wetlands on the subject property must be provided a wetland buffer in accordance with Rule <br />D according to the size of the wetland basin a:; follows; <br />o Wetland basin 1 acre or less»16.S-foot wetland buffer <br />o Wetland basin 1 - 2.5 acres * 20-foot wetland buffer <br />o Wetland basin 2.S - S acres = 2S-foot wetland buffer <br />o Wetland basin >5 acres - 3S-foot wetland buffer <br />Wetland impacts must be addressed in accordance with the Wetland Conservation Act <br />Wetland mitigation for excavation in types 1,2, and 7 must be provided 1:1 or submit a function <br />and value study using MnRAM or MCRAM assessment method to demonstrate that the function <br />and value of the wetland is increased with the excavation <br />Rule N: Stormwater Management <br />Requirements are based on the SIZE OF THE SITE and DENSITY OF UNITS as follows: <br />• Stormwater management requirements for single family home subdivision with a density of less <br />then or equal to 2 units oer acre a re as follows; <br />o Size of site 8 acres - 20 acres <br />■ Project must propose permanent Best Management Practices that are good for <br />water quality in addition to those required for rate control. <br />■ Stormwater runoff rate control <br />• Submit existing and proposed runoff rates for the 1,10, and 100 year rain <br />events. Run off rates may not increase from the exiting rates <br />J