Laserfiche WebLink
.1 <br />« • »•» . • «•" <br />agricultural* native prairie* forest, or naturally vegetated <br />land* the local government unit shall be the RGU* except that <br />this aubpart does not apply to agricultural land inside the <br />boundary of the Metropolitan Urban Service Area establiehed by <br />the Metropolitan Council. <br />Be For projtctB resulting in the conversion of 640 or <br />more acree of forest or naturally vegetated land to a different <br />open space land use* the local government unit shall be the RGU. <br />SAt MS a 116C.94> 116D.04> 1160.045» L 1990 c 401 s 54 <br />BXni 11 8R 714; 13 SR 1437j 13 SR 20461 17 SR 139; 21 SR 1458; <br />24 SR 517 <br />1.4400 MAmOORT BIS CAnOORIBS. <br />t 1. Thtealiold test. An RIS must be prepared for <br />projl^s that meet or exceed the threshold of any of subparts 2 <br />to 24^^hltiltiple projects and aultiple stages of a single <br />project e^t are connected actions or phased actions must be <br />consideceS^ total when comparing the project or projects to <br />this threshoMs of this part. <br />Subp. 2. ^elear fuels and Bueleac waste. Items A to 0 <br />designate the IHD for the type of project listedi <br />A. For theWonstruction or expane ion of a nuclear <br />fuel or ruclear «w^e processing facility* including fuel <br />fabrication faeilitWs* reprocessing plants* and uranium mills* <br />the OMR shall be the^ffO for uranium mills; otherwise* the PCA <br />shall be the RGU. _a high level nuclear waste <br />be the RGU. <br />an away-from-reactor facility <br />nuclear fuel* the CQB shall be <br />B. For eonstt‘>ctio|L of <br />disposal site* the BOB snKl <br />C. For construction <br />for temporary storage of spel <br />the RGU. _ <br />D. For construction of a level nuclear waste <br />disposal site* the HUB shall be tlk RGU. <br />Subp. 3. Mlectrlc generating fi^Uities. For construction <br />of a large electric power generating^^nt pursuant to part <br />4410.7000* the BOB Shall be the RGU. <br />Subp. 4. Petroleum refineries. For^snstruction of a new <br />petroleum refinery facility* the FCA shal^be the RGU. <br />Subp. 5. Fuel conversion facilities. I%ns A and B <br />designate the RGU for the type of project lii <br />A. For construction of a facility for thWjConversion <br />of coal* peat* or biomass sources to gaseous* lig^^d* or solid <br />fuels if that facility has the capacity to utilixd^50*000 dry <br />tons or more per year of input* the PCA shall bo <br />B. For construction or expansion of a facility <br />the production of alcohol fuels which would have or \ <br />increase its capacity by 50*000*000 or more gallons per vwr of <br />alcohol produced* the PCA shall be the RGU. ^ <br />Subp. 6. Franaaissioa lines. For construction of a high <br />voltage transmission line pursuant to part 4410.7400* the BOB <br />1 <br />! <br />woe