Laserfiche WebLink
-i <br />t'"-* <br />V <br />t <br />A <br />disposal facility* tha PCA shall be the RGU. <br />Bi Foe construction of a hasardous waste processing <br />facility with a capacity of 1*000 or more kilograms pec month* <br />the PCA shall be the AGO. <br />C. For expansion of a hazardous waste processing <br />facility that increases its capacity by ten percent or more* tha <br />PCA shall be the RCU. <br />D. For construction or expansion of a facility that <br />sells hazardous waste storage services to generators other than <br />the owner and operator of the facility or construction of a <br />facility at which a generator's own hazardous wastes will be <br />stored for a tine period in excess of 90 days* if the facility <br />is located in a water-related land use suinageaent district* or <br />in an area characterized by soluble bedrock* the k'ZK shall be <br />the RCU. <br />8ubp. 17> Solid waste. Items A to G designate the RCU for <br />the type of project listed: <br />A. For construction of a nixed municipal solid waste <br />disposal facility for up to 100*000 cubic yards of waste fill <br />per year* the PCA is the R6U. <br />B. For expansion by 25 percent or store of previous <br />capacity of a nixed municipal solid waste disposal facility for <br />up to 100*000 cubic yards of waste fill pec year* the PCA is the <br />RGU. <br />C. For construction or expansion of a nixed municipal <br />solid waste transfer station for 300*000 or store cubic yards per <br />year* the PCA is the RCU. <br />D. For construction or expansion of a mixed municipal <br />solid waste energy recovery facility or incinerator* or the <br />utilisation of an existing facility for the combustion of nixed <br />municipal solid waste or refuse-derived fuel* with a capacity of <br />30 or store tons per day of input* the PCA is the RGU. <br />B. For construction or expansion of a nixed municipal <br />solid waste compost facility or a refuse-derived fuel production <br />facility with a capacity of 50 or nore tons per day of input* <br />the PCA is the RGU. <br />F. For expansion by at least ten percent but less <br />than 25 percent of previous capacity of a nixed municipal solid <br />waste disposal facility for 100*000 cubic yards or nose of waste <br />fill per year* the PCA is the RGU. <br />C. For construction or expansion of a nixed municipal <br />solid waste energy recovery facility ash landfill receiving ash <br />from an Incinerator that burns refuse-derived fuel or nixed <br />municipal solid waste* the PCA is the RGU. <br />Subp. 18. WMtewater systens. Items A to c designate the <br />RGU for the type of project listed: <br />A. For expansibn* modification* or replacement of a <br />nunicipal sewage collection system resulting in an increase in <br />design average daily flow of any part of that system by <br />1*000*000 gallons per day or nore* the PCA shall be the RGU. <br />^ .