Laserfiche WebLink
t I <br />FTHE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, January 20,2004 <br />6:00 o'clock p.m. <br />from creeks and wetlands since the late I970's; tested sites for Lot I were accepted at less than a <br />73' setback. <br />Since the original subdivision was created prior to dtft 1994 adoption of "front lot/back lot" <br />starulards (Sections 78*1370 and 82-256), the existing lots aren ’t subject to these special setback <br />and area requirements, but because new lots are being created, the subdivision will be subject to <br />those standards. The impacts include: <br />- Lot I u a back lot must meet a 3 acre minimum (it does); <br />- Lot I is subject to 130% of the standard setbacks. <br />- Access to Lot I must be via a 30' driveway oudot (as proposed) <br />• Lot 2 is subject to a 30' side street setback from the driveway outlet, rafrier dun a <br />30' side setback. <br />Gaffron summarized the Regulatory Impacts as follows: <br />1. <br />fr)r <br />The 968' OHWL along frie creek is frie contour from which sefr)acks should be measured <br />this pn^ierty. The key OHWL sediacks that affect development of the site are: <br />• 100'structure seAack from OHWL <br />• 73' septic setback from OHWL <br />• no hardcover allowed within 75' of OHWL <br />Areas below the OHWL will not count toward lot area calculations. <br />The lot dxyAvet areas and fr» OHWL sed)scks as shown by die surveyor appear to <br />be acceptable. <br />Wetland delineations and the OHWL determination have established boundaries which have a <br />somewhat limiting effect on the buildable area, especially of Lot 1, due to non-buildability of <br />wetland and frie 26' setback requiienumt <br />4. The original ai^nrovals to constmct a driveway wifriin existing Oudot A paralleling the <br />creek, and to construct a creek crouing, are no longer valid, because dre driveway and credc <br />crossing were never constructed and new, more restrictive regulations have since been adopted <br />which would make such construction a violation of current codes. A number of variarves are <br />PAGE 26 of 64 <br />. 7,. <br />I <br />I <br />J