Laserfiche WebLink
8. Neither lot is subject to the Park Fee because such fee was paid with the prior subdivision. <br />9. Lot 1, considered as a newly buildable lot. is subject to a Storm Water and Drainage Trunk <br />Fee in the amount of $10,800. Lot 2 is an existing buildable lot and is therefore not subject <br />to the Storm Water and [>rainage Trunk Fee. <br />10. The sloped area southeast of the creek within Lot 1 with slopes of 18% or greater shall be <br />considered as non-buildable land. Applicant shall execute a covenant establishing restrictions <br />on this portion of Lot 1 to prohibit the placement of structures within said sloped areas. <br />11. Applicant shall submit a final driveway design meeting the approval of the Orono Fire Marshal <br />and the City Engineer prior to issuance of building permits. <br />12. Applicant shall provide to the City evidence of a private shared driveway easement and <br />covenants for driveway maintenance over Outlot A in favor of Lots 1 and 2. <br />13. Lot 2 shall have vehicular access to Watertown Road via the private driveway to be <br />established in Outlot A, and any existing access points from lot 2 to Watertown Road shall <br />be graded so as to be unusable, prior to issuance of a certificate of occupancy for any home <br />on Lot 2. <br />14. AH identified primary and alternate sewage system drainfield sites within the subdivision shall <br />be fenced off prior to any land alterations, and such fencing shall remain in place until such <br />time that each Lot is developed. <br />15. <br />17. <br />Subdivider shall establish covenants for each lot for protection of drainfield sites within each <br />Lot. Covenants shall include protective language for alternate septic sites along with site plans <br />locating both primary and alternative sites. Applicant shall include language alerting future <br />property owners of the need to protect sites on adjacent properties. <br />Subdivider is hereby advised that preliminary subdivision approval will expire within one year <br />of the date of Council approval, March 8,2005. Should the subdivider fail to co»nplcte the <br />filing of the final plat application within the year deadline, it shall be necessary for the <br />subdivider to file a new preliminary subdivision application with the City. <br />Page 6 of 9