Laserfiche WebLink
I <br />Total of items # 1 - # 19, including Contractor ’s overhead & profit $23,113.00 <br />The original Contract Sum was <br />Net change by previously authorized Change Orders <br />The Contract Sum prior to this Change Order was <br />The Contract Sum will be increased by this change order in the amount of <br />The new Contract Sum including this Change Order will be <br />$ 1,981,000.00 <br />$ 227,178.49 <br />$ 2,208,178.49 <br />$ 23,113.00 <br />$ 2,231,291.49 <br />The Contract time will be increased by 0 days. <br />The Date of Substantial Completion was January 7,2003 <br />NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br />have been authorized by Construction Change Directive.!5 <br />Authorized: <br />ARCHITECT CONTRACTOR OWNER <br />Boarman Kroos Vogel Group, Inc. <br />Address <br />Rochon Corp. <br />Suite 120, 3650 Annapolis Lane North <br />City of Long Lake <br />1964 ParkAve. <br />P.O. Box 66 <br />Crystal Bay, MN 55323 <br />BY <br />DATE <br />AIA DOCUMENT G70I * CHANGE ORDER • 1987 EDITION * AIA - COPYRIGHT 1987 • <br />THE AMERICAN INSTITUTE OF ARCHITECPS. 1735 NEW YORK AVE., N.W., WASHINGTON. D C. 20006-5292 <br />WARNING: Unlicensed photocopying vioiates U S copyright law and is subfect to legal prosecution. Ttus document was electronically produced with permission <br />o( the AIA and cannot be reproduced wtthoul violation until Ihe date of expiration noted below________________