My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-2004 Council Packet
Orono
>
City Council
>
2004
>
02-23-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 8:52:34 AM
Creation date
1/19/2023 1:20:52 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From:"Doucette, Elise" <Elise.Doucette<8state.mn.u8> <br />To:"Melanie Curtis" <mcurtisOci.orono.mn.u8> <br />Date:1/19/04 1:39PM <br />Subject:RE: Stevan Wagner <br />Melanie, <br />From discuMions with Mr. Wagner, I have instructed him to notify the state of the maintenance of the <br />treatment system, if the P.i.G was replaced, if the system was pumped, etc. on the Industrial Storm Water <br />permit's Annual report due March 31 tor the previous year. An engineer reviewed the plans you faxed to <br />us and had no comments on the design. Mr. Wagner is covered under the permit upon sutmission of the <br />application. The state will be updeting the irtdustnal storm water rules, and therefore vwn’t issue a permit <br />until that time. Mr. Wagner will be operating under the old permit requirements. It is appropriate to say <br />that state approves of the system, but we will not be submitting anything to the company in writing. Also, <br />the industrial storm water permit covers activities and materials that may come in contact with storm <br />water. This includes the washing of vehicles and treating of the wastewater. However, the permit will not <br />be specific to the system. This is the reason I told Mr. Wagner to be specific about maintenance on the <br />treatment system in the annual report. <br />I hope this satisfies the cities questions and requirements. Please let me know if there is anything else <br />that can be done. <br />Thanks, <br />Ellse M. Doucette <br />Minnesota Pollution Control Agency <br />Regional Environmental Management <br />Waste Management and Wastewater Unit <br />(651)290-7290 <br />■Original Message* <br />From: Melanie Curtis [mailto.mcurtisOci.orono.mn.us] <br />Sent Friday, January 09,2004 9:11 AM <br />To: Elise.OoucetteOstate.mn.us <br />Subject: Stevan Wagner <br />Elise- <br />In my report to Orono's Planning Commission is it safe to say that Mr Wagner's proposal received <br />approval by the PCA permitting process? Are there any special conditions placed upon the project or <br />property? <br />Melanie <br />Melanie Curtis <br />City Planner <br />2750 Kelley Parkway <br />Orono, Minnesota 55356 <br />p: 952 249.4627 f. 952-249-4616 <br />?
The URL can be used to link to this page
Your browser does not support the video tag.