Laserfiche WebLink
Date Application Received: 06-19-03 <br />Date Application Couidcred ai Complete: 1(M)7>03 <br />60-Day Review Period Expires: 12*07-03 <br />60-day Review Period Extension Expires: 02-07*04 <br />Additional 60-day Review Period Expires: 04-08*04 <br />COnM'^M MPPTING <br />FEB 2 i 2004 <br />City of orono <br />REQUEST FOR COUNCIL ACTION <br />Date: February 19,2004 <br />Item No ^ ^ <br />DcpartmcDt Approval: <br />Name: Melanie Curtis <br />Tide: City Planner ______ <br />Administrator Approval:Agenda Section: <br />Zoning <br />Item Description: #03-2923 - Stevan Wagner - Commercial Site Plan Review <br />Zoning District: B>1, Retail Sales Business District (20,000 s.f. minimum) <br />Lot Area: 1.163 acre (50,682 s.f.) <br />Lot Width: 250* <br />List of Exhibits: <br />A. PC Action Notice 01*20*04 <br />B. PC Action Notice 10*20*03 <br />C. PC Memo & Exhibits 01-08*04 <br />D. Minutes from October 20,2003 Planning Commission <br />E. Minutes from January 20, 2004 Planning Commission <br />F. Letter from Tom Kellogg, City Engineer, dated January 22, 2004 <br />Application Summary: <br />The applicant is requesting a commercial site plan review in order to construct a 1,770 s.f. <br />addition to an existing building. The application consists of the following: <br />1 . Conunercial site plan review in order to obtain a building permit to remodel and expand and <br />existing 2,310 s.f. concrete block building on the property to a 4,080 s.f. building, a 1 ,770 s.f. <br />total expansion. <br />2. Sign setback variance in order to allow the existing sign to be refaced and remain at its <br />current substandard setback. The sign is setback 8’ from the front property line where 10 ’ is <br />required. The signage will extend an additional 4’ into the setback area for a sign setback of <br />4’ where 10 ’ is required. <br />3. Hardcover variance in order to construct a 1,770 s.f. addition to the existing building. The <br />.expansion will be constructed over existing hardcover. <br />This application was first reviewed by the Plamiing Commission on October 20,2003 and was tabled <br />in order for the applicant to respond to requests for the following additional information: <br />1 . Storm water management plan (drainage and grading indicated) <br />2. Detailed landscape plan (including vegetative screening). <br />3. Lighting plan. <br />4. Detailed outdoor storage plan, including staging - existing and proposed. <br />5. Exterior building materi2d detail. <br />6. Hazardous waste management solutions.