My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-2004 Council Packet
Orono
>
City Council
>
2004
>
02-23-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 8:52:34 AM
Creation date
1/19/2023 1:20:52 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
R§»iontlon ObJ^elivta and Conatruetlon Fropcaad <br />• Provide worfer quality treatment for Stubbs Boy <br />• Enhance wildlife and aesthetic functional values <br />• » Restore the wetland plant community within the reed canary grass <br />portion of wetland <br />• Restore hydrology to the wetlarKl basin with a series of ditch blocks <br />orxj a berm with a control structure. <br />Stapa In the propoaad afatland raatoration Ineluda tha following: <br />1. Construct a berm arxJ outlet control .structure. <br />2. Complete two controlled bums of the wetland site to aid in <br />controlllrxj the reed canary grass and Increase the nutrient uptake <br />of the wettarKl with riew growth of vegetation. Provide a spot <br />treatment of herbicide to further control reed canary gross. <br />3. Seed selected portions of the wetland with wetland gross and <br />forbs. <br />Table 5.7 Project Cost for Wetland SB-E-31 <br />« i <br />Components |Description <br />1 <br />Approximate <br />Cost <br />Surveys Field and topographic survey of site $ 3,000 <br />a <br />Design Complete site design including draft plan and final <br />construction documents <br />Permits • Obtain necessary permits $ 2,500 1 <br />Meetings Meetings with Oty staff and surrounding landowners $ 1,300 i <br />Land and Legal <br />Purchase of easetnents around wetland or access to <br />control structure. Easenients should already exist <br />along public road for access to control structure. <br />Rtftorabon <br />Complete 2 prescribed bums and spot herbicide <br />treatment to control exotics <br />Seed and/or plant fringe areas <br />; Construction berm, cfitch blocks and control structure <br />$ 1,500 <br />$ 5,000 <br />$ 7,500 <br />$35,000 <br />Approximete Project Cost $64, <br />atyofOnno <br />SuH^WiiDrHaagementPan <br />5-14 <br />ywdtndi Mantg mn mt
The URL can be used to link to this page
Your browser does not support the video tag.