My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-2004 Council Packet
Orono
>
City Council
>
2004
>
02-23-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 8:52:34 AM
Creation date
1/19/2023 1:20:52 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
vv/ <br />CONSENT <br />Permit Application No.: 02-433 <br />Applicant: _____Tom Cullnm_______ • <br />Project: _____Wcdand Alteration_____ <br />Location: _____785Ferndale Road. Orono <br />Rule: <br />Received: 11/12/02 <br />.Complete: 12/OS/Q3 <br />Notification: 12/10/03 <br />Recommendation: <br />Approval. Permit should not be issued until the foltowinf; conditions are met; <br />1. Reimbursement of mailing costs <br />2. Reimbursement of Rule J Fees . <br />3. Submittal of a Declaration for the preservation of the wetland butler which must be executed and <br />recorded <br />4. Submittal of a surety for wetland alteration in the amount of $5,000 valid until the end five-year <br />monitoring period. <br />5. Approt^l from the City of Orono______________________________________________ <br />Background: <br />The applicant is proposing w'etland alteration at die location cited above in the City of Orono. The project <br />consists of a berm for the establishment of trees in a type S wetland less than one acre in size along the <br />western edge of the property line. As shown on the site plan there will be an opening in the middle of the <br />berm 10-12 feet wide to allow for hydrology to be maintained on the western portion of the wetland off <br />the subject property. An application for No-Loss has been submitted for the berm. The applicant also <br />proposes to create a 16.S-2S foot wetland buffer, converting mowed Kentucky bluegrass to native wetland <br />buffer vegetation in addition to the creation of 2,135 square feet of new wetland in adjacent upland as part <br />of the proposed project A permit would allow for alteration of a wetland. <br />Rule B: <br />Erosion control consisting of silt fence and a wetland buffer seeding plan is proposed. <br />Ealp-Pi <br />The proposed project will fill 2,135 square feet of wetland for the creation of a berm to support trees, <br />provide 2,135 square feet of new wetland, and provide a 16.5-25 foot wetland buffer which will be <br />converted from mowed Kentucky bluegrass to native vegetation. As stated above, the purpose of the berm <br />is to provide for the establishment of trees such as green ash, silver maple, and northern white cedar. The <br />proposed berm will less then 12 inches above the normal water level of the wetland. The low profile of <br />the berm is to allow for wetland hydrology to persist and qualify the fill for a No-Loss exemption in the <br />Wetland Conservation Act. A Technical Evaluation Panel consisting of MCWD staff and engineering <br />consultant. Board of Water and Soil Resources, and Hennepin County Environmental Services met widi <br />the City of Orono and the applicant’s wetland consultant The panel ^scussed at length the application for <br />No-Loss defmed in MN Rule 8420.0220 which applies if the proposed work will not impact the wetland, <br />i.e. diminish the quantity, or biological diversity of the wetland. The goal of the design for the proposed <br />fill is to maintain the three criteria of a functioning wetland. The panel concluded that the proposed <br />project would result in benefit for the function and value of this wetland and could function as wetland. <br />As a condition of the permit, staff recommends a monitoring report be submined to MCWD once each <br />year for five consecutive years regardmg status of the berm as a functiorung wetland and the success of <br />the establishment of the wetland buffer. <br />Attachments: <br />1. Perniit application <br />2. Site plaii/survey <br />3. Wetland buffer seeding plan (4) <br />4. Site location map ________ <br />Renae Clark Date
The URL can be used to link to this page
Your browser does not support the video tag.